Is the entry to the site complete?
-
Is the parking area completed - curbs and wheel stops in place?
-
Is the parking area stripped?
-
Are the handicap spaces clearly marked with necessary signs?
-
Are the sidewalks complete?
-
Is there an ADA ramp?
-
Is the parking area lighting installed and operating?
-
Is the dumpster pad complete?
-
Is the trash enclosure complete and painted Mocha?
-
Is the grease trap installed?
-
Is the grease/oil collection bin on site?
-
Is the landscaping completed?
Inspections and Permits
-
Has the Certificate of Occupancy been obtained?
-
Has the Fire Inspection been obtained?
-
Has the Health Inspection been obtained?
-
Has the Test and Balance been performed and the report obtained?
Building Exterior
-
Are all doors and windows installed?
-
Is the tower structure complete with stucco?
-
Is there a raised area of the EIFS at the round sign?
-
Is the building painted the appropriate Evolution colors?
-
Is stone used in place of the Nichiha panels? If so what is the spec?
-
Are the trim caps painted the appropriate Evolution colors?
-
Are the wall pack lights installed and operational?
-
Are the front and rear canopies installed and flashed to the building?
-
Are the canopy light fixtures operational?
-
Are the awnings installed over the windows/doorways?
-
Are the awning light fixtures installed and operational?
-
Are the walk-ins installed and flashed to building?
-
Is the roof ladder installed?
Roof
-
Is the roof system complete and checked for leaks?
-
Are all roof top units installed and operational?
-
I the trim cap installed and painted per spec?
Exterior Signage
-
What style is the roadside sign?
-
Is there a reader board attached?
-
Are the poles and cabinet painted black?
-
Are the signs illuminated properly?
-
Are there any directional signs? Describe.
-
Is the 7' round sign installed and operational on the tower?
-
Are the channel letters installed and operational?
-
Are there feature panels on the building?
-
Do the feature panels have an awning or light fixture?
-
Is the Breakfast. Lunch. Dinner plaque installed on the tower?
-
Note any other signage.
Entry Vestibule
-
Is the flooring to spec and completed?
-
Is the wainscoting to spec and completed?
-
Is the chair rail to spec and installed?
-
Is the interior door installed and working properly?<br>
-
Are the vestibule windows installed and sealed?
-
Is the lighting to spec and working properly?
-
Is the ceiling painted to spec?
-
Is there a spec waiting bench?
Dining Room
-
Is the ceiling grid and tiles to spec and completed?
-
Are all the diffusers and return grills installed?
-
Are the recessed can lighting fixtures to spec, installed and working properly?
-
Are the pendant lights over the booth seating to spec, installed and working properly?
-
Is the Gold wall covering applied and seamed correctly?
-
Is the Brown wall covering applied and seamed correctly?
-
Is the decor package installed?
-
Are the walls painted according to spec and the plans?
-
Is the chair rail installed throughout the dining area?
-
Is the Marlite wainscoting installed throughout the dining area?
-
Is the floor tile and cove base installed throughout the dining area?
-
Is the Huddle Booth installed?
-
Are the ceiling light fixtures in the Huddle Booth to spec, installed and working properly?
-
Is the vinyl decor installed in the light box on top of HB?
-
Is the light shining through the vinyl properly?
-
Is the spec paint used on the Huddle Booth walls?
-
Is the "Huddle in the House" valance installed?
-
Is the appropriate wall decor package installed in the HB?
-
Is the spec round table in place in the HB?
-
Are all the booths in place with proper spacing?
-
Do the banquette seats fit properly?
-
Are all table tops correct, installed and in place?
-
Are the correct number of chairs on the floor?
-
Is there a counter top installed?
-
Are the correct number of bar stools in place?
-
Has the trim cap been installed on all half walls?
Cook/Service Line
-
Are the ceiling light fixtures operational?
-
Is the ceiling grid and vinyl tiles installed?
-
Is the "Huddle In Huddle Up Huddle Happy hanging valance installed?
-
Is FRP applied per plan?
-
Is the quilted stainless steel installed per plan?
-
Is the spec flooring and cove base per spec and installed?
-
Are all outlets working?
-
Is the equipment in place per the plan?
-
Is the hood and its lights working properly?
-
Is all the electric equipment plugged in and working?
-
Are all the gas lines connected and checked for leaks?
-
Is the gas equipment operational?
-
Is the hand sink mounted and operational?
-
Are the soap and sanitizer dispensers mounted by the hand sink?
-
Is there a paper towel dispenser mounted by the hand sink?<br>
-
Is the door to the BOH installed?
-
Are the POS stands in place?
-
Is the trim cap at the cash POS per spec and installed?
-
Are the terminals live and ready for the POS system?
-
Is the POS system set to be delivered before training arrival?
-
Is the condiment shelving installed at main beverage station?
Beverage Stations
-
Are the soda fountains installed with electrical and plumbing?
-
Is the Royal Cup package installed with electrical and plumbing?
-
Is the Minute Maid juice machine installed with electric and plumbing?
-
Is the ice cream freezer installed?
-
Is the dipper well installed and operational?
Back of House
-
Is the ceiling grid and vinyl tiles installed?
-
Are all light fixtures installed and working properly?
-
Are walls covered with appropriate wall finishes?
-
Is the flooring and cove base installed and complete?
-
Are wall mounted shelves installed?
-
Are stainless tables and shelving units put together and in place?
-
Is the oven plugged in an operational?
-
Is the dish machine set up with electric and plumbing? (Spray hose, sink drain, machine water inlet and drain)
-
Are the clean and soiled tables in place?
-
Is the three compartment sink hooked up and ready for chemicals?
-
Is the single compartment sink operational?
-
Is the hand sink installed and operational?
-
Are the soap, sanitizer and paper dispensers installed at hand sink?
-
Is the mop sink operational with mop hanger?
-
Is the water heater operational?
-
Are the walk-in freezer and cooler operational and at temp?
Office
-
Are shelves and desk top installed?<br>
-
Are the POS lines run and ready for the equipment?<br>
-
Is the ceiling complete?
-
Is the flooring complete?
-
Is the safe installed?
Restroom Vestibule
-
Is the ceiling per spec and complete?
-
Is the lighting per spec and operational?
-
Are the walls painted per plan and spec?
-
Is the vestibule decor installed?
-
Is the chair rail per spec and in place?
-
Is the wainscot per plan and spec?
-
Is the flooring per spec and installed?
Restrooms
-
Is the ceiling per spec and complete?
-
Is the lighting per spec and operational?
-
Are the walls painted per spec above tile?
-
Are the walls tiled per spec?
-
Are the floors tiled per spec?
-
Are dividers per spec and installed?
-
Are fixtures installed at proper height and operational? This includes hand sink, toilets, and urinals.
-
Are accessories installed? This includes gab bars, mirrors, baby changing station, soap dispensers, paper towel dispensers, toilet paper dispensers, and feminine product disposal.