Title Page
JOB DETAILS
-
Date
-
Prepared by
-
Job number
-
Address
-
QA Type
Site Condition
PRE-SITE PHOTOS
-
Site sign
-
Internal building condition
-
Comments
-
External building condition
-
Comments
QA
GENERAL
-
Is plan in meterbox?
-
Is installation as per plan?
-
Are light fittings installed?
-
Ducted heating light & gpo installed and tested?
-
Evap cooler gpo installed and tested?
-
Is double gpo in roof installed for add-on cooling?
-
Tv antenna and splitter installed?
-
Is house powered up?
-
House test
-
Network test
-
TV test
-
Fibre test
-
Alarm test
-
Intercom test
-
Smoke detector test
-
RCD test
-
External vents for exhaust fans installed?
-
External vents for rangehood installed?
-
External outlets siliconed?
-
Is rangehood installed?
-
Is audit sticker in switchboard?
COMMS
-
Do you need to audit comms?
-
Fiber wired correctly?
-
Hub wired and installed correctly?
-
Speakers wired correctly?
-
HDMI wired correctly?
-
Pay TV wired correctly?
-
TV conduits installed correctly?
SECURITY / INTERCOM
-
Do you need to audit security & intercom?
-
PIR's as per order?
-
PIR's wired correctly?
-
Phone installed for alarm, and is it the first point?
-
Keypad, intercom and external siren in correct locations?
-
Intercom wired correctly?
-
Reed switches wired correctly?
-
Cameras wired correctly?
DUCTED VAC
-
Do you need to audit ducted vac?
-
Ducted vac points as per plan and order?
-
Bends and t-pieces installed?
-
Piping clear of light fittings?
-
Vac sweep installed?
-
Main pipe at 1500mm AFL?
Conclusion
-
Site Damages?
-
Take photos of site damages
-
Incomplete works?
-
Take photos of incomplete works
-
What material is required to complete works?
-
Is internal fit off complete?
-
Is any follow up required for light fittings?
-
Are all globes installed?
-
Is external fit off complete?
-
- Alfresco
- Front porch
- Balcony
- Garage
- Externals ie. scaffolding, cladding
-
Is site manager call back required?
-
Is a re-inspection required?
-
Is a return visit required?
-
Any works to be completed pre-handover?
-
Any works to be completed at handover?
-
Is a purchase order required for extra works?
-
What extra works are required?
-
Is Audit sticker in switchboard?
-
Photo of QA plan
-
Photo of marked plan
-
Employee name (ensure you press save after signing)