Header
BUILDING INFORMATION
-
Project Number:
-
Room name
-
Room number
-
Site Address:
TECHNICIAN INFORMATION
-
Engineer Name:
-
Date of Survey
-
SWIPE TO NEXT SECTION >>>
Room Survey
-
Is the room currently in use ? Please include photos of each of the 4 corners of the room.
-
Is there any existing AV equipment?
-
Please list all AV equipment broken down into its location and photograph
Room construction details
-
Please Sketch a diagram of the room. This will need to include table dimensions, table distance from walls & Floorbox distances from display wall .
-
Cable routes - Please confirm is required cable routes are present
-
Screen Wall material?
- Plasterboard Single
- Plasterboard Double
- Ply Lined
- Concrete
- Dot & Dab
- Acoustic Panels
- None of the above, please expand in next quesiton
Tap to enter information
-
If none of the above was selected, please expand
-
Room Dimensions - Please provide full room dimensions
-
Floor Type
-
Please advise on floor void depth and photograph
-
Please advise on void depth and photograph
-
Please advise if channels are present
-
Ceiling Type
-
Please advise on void depth and tile size if possible and photograph void
-
Please advise on void depth if possible and photograph void
-
Please photograph ceiling
Power and Data
-
Power at table - Please list each floor box if their is multiple
-
Data at table - Please list each floor box if their is multiple
-
Power and data at other relevant locations within the room
-
Are there numerous display walls?
-
Please note Power and data and cable route for each location
-
Wall Services - Data (Include Height)
-
Wall Services - Power (Include Height)
-
Wall Cable Route
-
Please take photos of screen on wall and behind is possible to remove. If you cant remove, then please try to get some photos behind
-
Please list any other information you think may be useful.
-
Please take anymore photos you think may be useful.
-
Does the client have any additional comments or requests?
-
Please detail