Title Page
-
Site Location
-
Description of work to be carried out
-
Customer Name
-
Conducted on
-
Assessment carried out by
1 - Site Induction
-
1.1 - Completed a site induction including H&S
2 - High Risk Process Evaluation
-
2.1 - is the work are a confined space?
-
Please ensure the correct permit permit is issued for this type of work.
-
2.2 - Are you undertaking Hot Work? (Grinding, cutting, welding and in some cases soldering)
-
Please ensure you have the correct permit type and a suitable fire extinguisher to hand. Ensure you follow the customers fire watch procedure.
-
2.3 - Are you working on live electricity?
-
Please ensure you have the correct permit type for this work.
-
2.4 - Are you working at heights? (Using steps, ladders, platforms, MEWP's....)
-
Please ensure you have the correct permit for this work and any licences required for the equipment to be used.
-
2.5 - Are you working on high pressure air lines?
-
Please ensure that you have the correct permit for this work.
-
2.6 - Does the work involve exposure or potential exposure to asbestos?
-
This work should not be carried out without the correct PPE and and additional risk assessment and permit being carried out/issued.
3 - Workplace Hazards
-
3.1 - Is there free access and exit routs to and from the workplace?
-
Please state the observed hazards.
-
3.2 - Is the work area free from danger of slips, trips and falls?
-
Please state the observed hazards.
-
3.3 - Is the work area free from obstructions and projections?
-
Please state the observed hazards.
-
3.4 - Is the work area free from falling or moving objects?
-
Please state the observed hazards.
-
3.5 - Is there enough room to work safely?
-
Please state the reason for the lack of space.
-
3.6 - Are dangers from traffic adequately controlled?
-
Please state the observed hazards.
4 - Machinery Hazards
-
4.1 - Has the machine been isolated in such a way that tit cannot be inadvertently operated?
-
Please state what other protection methods have been put in place to justify this.
-
4.2 - Have all electrical hazards been safely covered?
-
Please state why not.
-
4.3 - Can the task be carried out without removing safety devises?
-
Please state what other safety procedures have been put in place.
-
4.4 - Are you adequately protected from extremely hot and cold machine parts?
-
Please state what precautions have been put in place to avoid exposure.
5 - Personal Exposure Hazards
-
5.1 - Have all lifting tasks been safely addressed? (2 man lift, hoist etc......)
-
Please state the reasons.
-
5.2 - Are you adequately protected against excessive noise?
-
Please state what additional precautions have been put in place to combat this.
-
5.3 - Is there adequate light to safely carry out the task?
-
Please request an additional lighting source.
-
5.4 - Is the work area free from excessive vibration?
-
What precautions have been put in place?
-
5.5 - Is the work area free from exposure to high temperature and humidity?
-
Please state what precautions have been put in place.
-
5.6 - Is the work are free from exposure to low temperature?
-
Please state what precautions have been put in place.
-
5.7 - Do you have the correct tools to carry out the task safely and are they in a good state or repair?
-
Please specify what is to be done to rectify this.
-
5.8 - Is the work area free from exposure to harmful substances covered under COSHH?
-
Please specify what additional precautions have been put in place.
6 - Administrative Controls
-
6.1 - Do you have the correct PPE to complete the task?
-
Ensure you attain the correct PPE before continuing with the task.
-
6.2 - Has the operator been informed of the work to be carried out?
-
Please specify who is aware of the work being done.
-
6.3 - Do you have the required skills to complete the task?
-
Please specify which parts of the task you are unable to complete and how this work is to be done.
7 - Comments
-
Domino UK signature
-
Customer signature