Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location
  • Project Title:

  • Date:

  • Job No.:

  • Site Supervisor:

  • Location:
  • Description of Work:

RISK ASSESSMENT

Work Activity

  • Reference

Documents

  • (e.g. SWMS, SWI, TCP No., Procedure No.)

  • Hazards with potential to cause serious injury or fatality

  • (Description of Hazard or Risk)

  • Risk

  • Rating

Control Measures

Elimination / Substitution / Isolation / Engineering / Administration PPE

New Risk

  • Rating

  • Tool Box Talk – Items Discussed

  • Name & Signature

  • Name & Signature

  • Name & Signature

  • Name & Signature

  • PERSONS PRESENT

  • Unique Document Number: SM005

  • Document Name: Site Specific Risk Assessment & Checklist

Responsible Group: Assets & Works

  • TRIM Reference: 3714E D17/166421

  • Adopted: 14/07/2009

  • Last Amended:

  • Review Date:

  • Version:

Page

  • 1 of 2

Daily Site Specific Risk Assessment and Checklist

  • Start-up – Checks before the planned activities commence

  • If YES, please complete Risk

  • Cones on both sides of roadway,

  • 3.0m either side of cables

  • TCP No

  • Time:

  • Time: am / pm

Risk Assessment

Site Workers

  • Site Specific Risk Assessment completed

  • Have individuals had the opportunity to “warm up”

  • Do any individuals have physical constraints or restrictions

  • Have all workers been inducted

Traffic Management

  • Are weather conditions suitable for work

  • TCP utilised

  • Any modifications to TCP required

  • TCP implemented (last sign erected)

Inspection drive

  • Traffic Controllers Name/s

Personal Protective Equipment

  • Is appropriate PPE available

Plant & Equipment

  • Are all Plant checklists completed

Work Practices

  • Are Plant capable of doing the days activities safely

  • Are planned manual handling tasks appropriate

Environmental Measures

Commence Work

  • The site and workers are ready for the days activities

  •  Work commenced at –

  • Time: am / pm

  • Shut Down – Checks after the planned activities are completed

  • First sign covered / removed

  • Time: am / pm

Site Workers

Site Conditions

  • Have all incidents been treated and reported

  • Are signs suitable for after hours warnings

  • Are barricades appropriate and properly erected

  • Have all trip hazards been removed or isolated

  • Have security arrangements been organised

Close Site

  • Are Plant securely locked down / parked up

  •  Site closed at –

  • Time: am / pm

  • Unique Document Number:

  • SM005

  • Document Name:

Site Specific Risk Assessment & Checklist

  • Responsible Group:

Assets & Works

  • TRIM Reference:

  • Adopted: 14/07/2009

  • Last Amended:

  • Review Date:

  • Version:

Page

  • 2 of 2

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.