Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
-
-
Project Title:
-
Date:
-
Job No.:
-
Site Supervisor:
-
Location:
-
Description of Work:
RISK ASSESSMENT
Work Activity
-
Reference
Documents
-
(e.g. SWMS, SWI, TCP No., Procedure No.)
-
Hazards with potential to cause serious injury or fatality
-
(Description of Hazard or Risk)
-
Risk
-
Rating
Control Measures
Elimination / Substitution / Isolation / Engineering / Administration PPE
New Risk
-
Rating
-
Tool Box Talk – Items Discussed
-
Name & Signature
-
Name & Signature
-
Name & Signature
-
Name & Signature
-
PERSONS PRESENT
-
Unique Document Number: SM005
-
Document Name: Site Specific Risk Assessment & Checklist
Responsible Group: Assets & Works
-
TRIM Reference: 3714E D17/166421
-
Adopted: 14/07/2009
-
Last Amended:
-
Review Date:
-
Version:
Page
-
1 of 2
Daily Site Specific Risk Assessment and Checklist
-
Start-up – Checks before the planned activities commence
-
If YES, please complete Risk
-
Cones on both sides of roadway,
-
3.0m either side of cables
-
TCP No
-
Time:
-
Time: am / pm
Risk Assessment
Site Workers
-
Site Specific Risk Assessment completed
-
Have individuals had the opportunity to “warm up”
-
Do any individuals have physical constraints or restrictions
-
Have all workers been inducted
Traffic Management
-
Are weather conditions suitable for work
-
TCP utilised
-
Any modifications to TCP required
-
TCP implemented (last sign erected)
Inspection drive
-
Traffic Controllers Name/s
Personal Protective Equipment
-
Is appropriate PPE available
Plant & Equipment
-
Are all Plant checklists completed
Work Practices
-
Are Plant capable of doing the days activities safely
-
Are planned manual handling tasks appropriate
Environmental Measures
Commence Work
-
The site and workers are ready for the days activities
-
Work commenced at –
-
Time: am / pm
-
Shut Down – Checks after the planned activities are completed
-
First sign covered / removed
-
Time: am / pm
Site Workers
Site Conditions
-
Have all incidents been treated and reported
-
Are signs suitable for after hours warnings
-
Are barricades appropriate and properly erected
-
Have all trip hazards been removed or isolated
-
Have security arrangements been organised
Close Site
-
Are Plant securely locked down / parked up
-
Site closed at –
-
Time: am / pm
-
Unique Document Number:
-
SM005
-
Document Name:
Site Specific Risk Assessment & Checklist
-
Responsible Group:
Assets & Works
-
TRIM Reference:
-
Adopted: 14/07/2009
-
Last Amended:
-
Review Date:
-
Version:
Page
-
2 of 2