Information

  • Approval Number

  • Client

  • Address

  • Prepared By

  • Contact Phone Number 6226 1477

  • Conducted on

  • Other Staff

  • Result

OHS Checklist

  • Is a First Aid Kit located in the vehicle or on site?

  • Are you working in a remote location? (satellite phone)

  • Has a Risk Assessment been undertaken for this inspection?

  • Is it safe to proceed with the inspection?

  • Have hazards been identified on site?

General

  • Has a water meter been installed

  • Water meter application to be lodged with Council

  • Photos

Internal Drainage

  • Do the Pipes have sufficient fall

  • Length of Branch

  • Floor waste, Vent and Inspection Openings

  • Has approved material been used

  • Bedding, side support and overlay

  • Filled Ground Compacted

  • Photos

External Drainage

  • Do the Pipes have sufficient fall

  • ORG and Inspection Openings

  • Concrete around boundary rises

  • Filled Ground Compacted

  • Have approved materials been used

  • Bedding, Side Support and Overlay

  • Photos

Onsite Sewage Management System

  • Tank installed in accordance with approved plans and manufacturers specifications

  • External drainage connected to tank

  • Effluent disposal system constructed/installed in accordance with Onsite Effluent Disposal Report

  • Two warning signs installed within effluent disposal area (AWTS systems only)

  • Effluent disposal area protected from possible vehicle and stock damage

  • Photos

Plumbing Final

  • External Taps securely fastened and sealed

  • Tempering valve Installed on hot water system

  • Hot water overflow taken 1 m horizontally from unit

  • Concrete Surrounds on Inspection openings and ORG

  • Water pump installed near tank

  • External Pipes Lagged

  • Vent Pipes Installed with vent cap

  • On-Site system installed to Manufacturers specifications and geotechnical Report

  • AWTS warning signs installed

  • Hot and Cold running water

  • Sealing of joints around pipes

  • Water Hammer

  • Photos

Required Information

  • Required Information

Result of Inspection

  • Result of Inspection

  • Comments

  • Inspected By

  • Supervisor

  • Supervisor

  • Ensure mortar/concrete mix is installed under all gullies/waste traps in accordance with AS3500
    Backfill with Approved Aggregate in accordance with AS3500
    Plumber to certify that Pressure test has been carried out with accordance with AS3500

  • Should you have any enquiries regarding this inspection report please contact Yass Valley Council on 6226 1477 or via email council@yass.nsw.gov.au

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.