Information

  • Job Site

  • Conducted on

  • Safety Personnel Conducting Audit

  • Supervisor

  • Engineer/ Prime Contractor

  • Location

1.0 Fire Prevention

  • Adequate number of chemical extinguishers onsite

  • Workers Trained in Extinguisher Use

  • Fire Extinguishers Accessible to Workers

  • Extinguishers secured from movement.

  • Extinguishers fully charged

  • Other

2.0 First Aid and Emergency Response

  • First Aid Trained Persons Onsite

  • First Aid Kit accessible and fully stocked

  • Emergency Response Complete (Muster Point, Nearest hospital etc.)

  • Workers aware of emergency response plan

  • Secondary vehicle onsite for site emergencies.

  • Emergency Phone Numbers Onsite

  • Other

3.0 Site Access

  • Tripping Hazards

  • Clean Level Ground

  • Adequate Site Access and Egress

  • Other

4.0 Housekeeping

  • Garbage and Debris Cleaned Up

  • Clear Work Areas

  • Clear Walkways

  • Other

5.0 Personal Protective Equipment

  • Head Protection

  • Foot Protection

  • Eye and Face Protection

  • Hearing Protection

  • Hand Protection

  • High Visibility Outerwear

  • Other

6.0 - Tools and Equipment

  • General Condition

  • Lock-out/Tag-out procedures in place with defective tools

  • Vehicle and Rig inspections complete

  • Safety Clevis in place

  • Vehicle/Rig stabilized when in use, outriggers are in place

  • Adequate safety guards in place

  • Other

7.0 - Electrical/ Utility Safety

  • Drill Rig Mast is 3meters (10ft) from high voltage power lines.

  • Underground Utilities Marked.

  • Current Utility Locates onsite.

  • Drilling location adequate distance from underground locates.

  • Other

8.0 Safety Requirements

  • Safety Manual Onsite

  • Hazard Assessment Completed

  • Toolbox Talk completed and discussed with Workers.

  • Workplace H&S Legislation Book onsite

  • MSDS Sheets Onsite

9.0 Public/Worker Way Protection

  • Proper Delineation- Public/Other Trades

  • Proper protection around Equipment/Materials

  • Proper lighting where Required

  • Ground Setup Isolated (Fencing)

  • Other

10. Training Requirements

  • Orientated on Maple Leaf Drilling Policies and Procedures

  • Supervisory Training

  • Safety Representative Training

  • WHMIS Trained

  • Other

Safety Infractions and Corrective Action

  • Number of Safety Infractions Onsite

  • Corrective Action for Site Audit Deficiencies

Sign Off

  • Site Supervisor

  • Health and Safety

  • Manager Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.