Title Page
-
OU Name
-
Conducted on
-
Prepared by
Checklist
Project Information
-
PSI Project Number
-
PSI Project Manager
-
Location
-
Anticipated start up work date (s)
-
Scope of Work
-
Site Contact (if applicable)
-
Internal or external drilling crews and equipment?
-
Any non-standard drilling, sampling, or tooling required?
In Case of Emergency
-
Are Emergency Contacts provided on drilling package?
-
Is nearest hospital included in drilling package?
Personal Protective Equipment
-
Hard Hat
-
Work Boots
-
Safety Glasses
-
Impact and Cut Resistant Protective Gloves
-
Hearing Protection
-
Safety Vest (required when working in or adjacent to active roadways)
-
Flame Resistance clothing
Emergency Equipment
-
First Aid Kit
-
Fire Extinguisher
-
AED
-
Other
-
Please specify:
Utilities
-
Is copy of public utility locate request in drilling package?
-
Is copy of public utility locate responses in drilling package?
-
Was a private utility locate performed?
-
Are there any overhead utility lines?
-
Can 35 feet of clearance be maintained from the overhead utility line at all times?
-
Are all borings within the marking boundaries specified on the locate ticket?
-
All utilities accounted for (i.e. either marked or indicated to not be present)?
-
Is the ticket date is valid (i.e. has not expired)?
Site Access and Conditions
-
Are boring locations readily accessible and/or marked?
-
What type(s) of drilling equipment can access? (check all that apply)
-
Are any permits required to access site?
-
Have permit documents been provided?
-
Is traffic control required
-
Has traffic control been coordinated?
-
Are hazardous chemicals or materials suspected on site?
-
Has exposure and/or respiratory protection been evaluated by a safety professional?
-
Is heavy equipment expected on site?
-
Provide operator certification
-
Is matting required?
-
Is access to water available?
Approvals
-
Project Manager Sign Off