Title Page
-
Conducted on
-
Prepared by
Description of Operation
-
Project or Department:
-
Date or expected frequency of mission(s):
-
Specific Location:
-
Description of Operation:
-
As necessary, include a sketch or diagram showing the planned sUAS flight path or area of operations. Sketch should include home point, observation points, applicable right of ways and property lines, and known hazards.
-
Attachments:
Explain Risk Mitigation measures for all Medium (yellow) and High (red) risks.
-
Complexity of Mission:
-
DOC experience with mission type:
-
Controlled Airspace:
-
Private Property:
-
Daylight:
-
Wires/Trees/Structures:
-
Drone Distance from Operator:
- Vertical Distance < 300 ft
- Vertical Distance > 300 ft
- Horizontal Distance > 400 yards
-
Proximity to Roads:
-
Proximity to Radio Towers:
-
Nearby Airport/Heliport:
-
Pedestrians/distraction:
-
Over Water:
-
GPS/Radio Dead Spots:
Overall Site Risk Rating
-
Fill in highest rating from the above inspection:
Signature
-
Responsible PIC:
-
Drone Manager:
-
Superintendent?