Title Page

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Site Photo

PMC AUDIT SCORING SYSTEM

  • no label

PMC HSE POLICY

  • Is Dar PMC HSE Policy communicated to all personnel at the project, through different communication channels

PMC HSE MANUALS

  • Is the PMC H&S Manual and the PMC Environmental Manual delivered to all personnel, by trainings and other communication channels

PMC INDUCTION TRAINING

  • Has the PMC HSE Induction training for Dar project employees been delivered recorded and maintained

PMC HSE OBJECTIVES

  • Are the objectives been discussed at the internal meetings and records kept

PMC PROJECT ORGANISATION CHART

  • Is the organization chart established, with all Dar site personnel which identifyies communication channels

PMC LEGAL REGISTER

  • Are all legal and other HSE requirements identified, kept up-to-date and communicated to persons working under their controls and any relevant interested parties.

PMC TRAINING

  • Is the training matrix for Dar personnel established, and records kept

PMC HSE NOTICE BOARD

  • Is the HSE Notice Board displayed at the workplace, with all the HSE relevant information required

PMC EMERGENCY PROCEDURES

  • Is the Emergency Preparedness procedure identified to all Dar Personnel through trainings and different communication channels

  • Does the Contractor have a competent HSE Team at site

  • Has the Contractor HSE Plan been submitted and reviewed by Dar HSE team

  • Have the Method Statements & Risk Assessments been submitted and reviewed by Dar HSE team

  • Is the Risk Register kept up to date and implemented properly

  • Are the emergency arrangements being undertaken periodically

  • Fire Safety - Fire Risk Assessment

  • First Aid - Provisions, First Aiders

  • Welfare Facilities

  • Electrical Safety - PAT Tests - Records

  • COSHH Assessments - Register, Storage

  • Has the contractor issued to Dar any Scaffolding 'Hand Over Certificates'

  • Has the Contractor submitted the necessary Lifting Plans for approval prior any lifting operations on sites

  • Are Project Registers Complete

  • Is sufficient HSE Signage displayed on the Project

  • Is PPE available and recorded as issue

PMC HSE INSPECTIONS

  • Are all HSE reports completed and recorded transmittal to the contractor with evidence of closure on issues raised

NON-COMPLIANCE (NCR)

  • Is the NCR Register been up to date and records kept

CORRECTIVE ACTION PLANS

  • Is the corrective action plan established and recorded for each audit report

ACCIDENTS, INCIDENTS, NEAR MISS

  • Are the reports been reported to the responsible parties and kept recorded. Are investigation reports recorded and corrective actions issued

PMC KPI WORKBOOK

  • Is the KPI workbook being submitted to the Dar PMC HSE - Amman, is it being accurately recorded and maintained

HSE MEETINGS, CONSULTATION

  • Is a HSE Meeting being conducted and minuted periodically to discuss the HSE Concerns on the Project

Additional comments

  • Additional comments

End

  • Auditor Signature

  • Representative signature

AUDIT MEETING

Audit Meeting

  • Regional Office:

  • Select date

  • Audited By:

  • Project Manager:

  • Project Name:

Aspected Audited

  • Office Safety

  • Office Environmental

  • Project Safety

  • Project Environmental

Summery of Findings/ Conclusion:

  • Summery of Findings/ Conclusion:

  • HSE Manager Signature:

  • Project Managers Signature:

  • Auditor Signature:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.