Engineer Name
-
Date and Time
-
Prepared by
-
Location
-
Supervisor / Foreman at time of this inspection
GENERAL
-
Has the vehicle been parked / positioned in an approate location for the works?
-
Are splicers trained in the proper operation and maintenance of the splicing machine?
-
Has a pre works check been completed and submitted?
-
Does the operatave have correct PPE for the task ahead?
SITE SETUP
-
Has the chapter 8 signage been placed out in the correct order and in approiate locations?
-
Has the opertive have enough gate guards for the task ahead (including the working area)?
-
Please add photos of the site set up.
EQUIPMENT CHECKS
-
Is the splicing machine located in a well-ventilated area to prevent exposure to fumes from melting fibers?
-
Is the splicing machine properly grounded to prevent electric shock hazards?
-
Are emergency stop buttons easily accessible in case of an accident or malfunction?
-
Is there a procedure in place for handling and disposing of waste materials generated during splicing operations, such as fiber scraps and cleaning materials?
-
Are there any signs of damage or wear on the splicing machine that could pose a safety risk?
-
Is there a procedure in place for handling and disposing of waste materials generated during splicing operations, such as fiber scraps and cleaning materials?
-
Is the GDU been used in good condition, free from defect, fit for purpose and within test date?
-
What is the test date on the ladder?
-
Is the signing and guarding that is been used in good working order and fit for purpose?
ENTRY INTO CHAMBERS
-
Has the correct method of lifting and opening the chamber been followed?
-
Has a roller bar and pit lifter No 5 been used?
-
Has the chamber been fully gas tested at all duct entry points and the 3 diffferent levels?
-
Has the GDU been left in the correct location in the chamber while working?
WORKING IN CHAMBERS
-
Has the chamber been checked for hazards prior to works?
-
Has a water test been completed (if required)?
-
Have all new cables been secured
-
Have all cables been correctly labeled with all relevent information?
-
Has the chamber been left in a safe and hazard free condition?
Sign Off
-
Has a final chack of site been completed prior to leaving?
-
Do you wish to add in any notes or observations from this live audit?
-
Has qualification of the gangs been seen and is it in date?
-
Engineer Signature