Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
Pile Cutoff
General Safety
-
Are all employees familiar with the JHA for this operation?
-
Have the Daily Task Analysis/Toolbox Talk & Equipment Inspections been properly filled out and signed?
-
Is there a first aid kit on site? Are emergency numbers and facilities identified?
-
Is there drinking water available on site?
-
Is the job site clean? Is the work area well maintained?
-
Are employees wearing the required PPE? (High visibility vest or clothing, hardhat, safety glasses, steel toe boots, gloves)
Excavations
-
Is excavation access/egress properly restricted using snow fencing, barricades, caution tape or other means? Are Materials/Debris 2 feet away from edge at top of excavation?
-
Are ladders being used for an excavation over 4' in depth? Does it extend 3’ above excavation with no tripping hazards at top?
-
Is proper cave in protection in place for excavation 5’ or greater? (Sloping, shoring, shielding, benching)
-
Are guard rails or other fall protection being used for an excavation 6' or more? Are they set up properly?
-
Top rail must be 42” (+/-3”) above ground level and withstand 200 lbs of horizontal force.
-
Mid rail must be 21” above ground level and withstand 150 lbs of horizontal force.
-
Toe boards secured to bottoms of posts, must be at least 3” in height.
-
If excavation is over 20' in depth, has a Professional Engineer designed and approved it?
-
Is excavation sufficiently dewatered? (No water above ankles)
Pile Chipping
-
Are employees wearing the required additional PPE for the task? (Hearing protection, face shield and respiratory protection)?
-
Are employees properly trained for this task (Chipping and Silica)
-
Are ladders being used according to manufactures specifications? (No modifications, 3 points of contact)
-
Are workers lowering equipment (Chipping guns/hoses) into excavation safely? (Using rope or strap)
-
Are workers chipping at One Pile Spacing Minimum?
-
Are air hoses free of cuts/lacerations, not leaking air?
-
Are air hoses secured using whip-checks, cotter keys or at a minimum secured with tie-wire at connections.
-
Are employees using dust control when chipping piles? (Water, vacuum, etc)
Steel Cutoff
-
Are employees wearing the required additional PPE for this task? (Hot work face shield)
-
Are employees properly trained for this task? (Hot Work)
-
Has Hot Work Permit been completed? (If required)
-
Is there a Fire Watch present during cutting who is carrying a working fire extinguisher?
-
Is the working area clear of combustibles?
-
Are Compressed Gas Cylinders properly stored? (Full and empty ones)
Weather
-
Is the Superintendent/Foreman monitoring weather conditions?
-
Is there shelter available for safe hiding from inclement weather? Grounded Conex, Mobile Office, or Personal Vehicle?
Discussion
-
Do all employees know the HJ Way for the week? Do all employees know the Weekly Safety Focus? Do all employees know the Keller Safety Principals [M.A.N.]?
-
Are employees aware of the Stop Work Authority program? Do all employees know that S.A.F.E stands for?
Feedback/Opportunities for Improvement
-
Add media
Signatures
-
Superintendent/Foreman
-
Safety Inspector