ECU Job Safety Analysis
JSA Details
-
Individuals involved with the development of the JSA
Click "Add Personnel" to enlist names & roles
Personnel
-
• Full Name & Role
Work Permits / Authorizations Required
-
Select the applicable work permit(s) / authorization(s) required
- Working at Heights
- High Voltage
- Confined Space
- Notifiable Work
- Crane Work
- Hot Work
- Isolation (Lock out)
- Hazardous Work
- Excavation & Trenching
- Traffic Management Plan
- Other
-
Enter other work permit
Safety Equipment Required
-
Select the applicable safety equipment(s) required for the job
- Hi Viz / Safety Boots
- Hard Hat
- Eye Protection
- Hand Protection
- Ear Protection
- Face Protection
- Protective Clothing
- Dusk Mask / Respirator
- Gas Detector
- Life Jacket
- Tripod (Confined Spaces)
Competencies & Trainings
-
List down applicable competencies & training to carry out individual tasks (Enumerate)
Equipment Check & Special Considerations
-
List down checked equipments & any special considerations (Enumerate)
Job Safety Analysis & Risk Assessment
-
Job Step / Tasks and Risk Analysis
Click "Add Job Step / Task" to enlist the job steps / tasks, hazards, controls & risk ratings
Job Step / Task
-
• Step in Process / Task
-
• Hazards
-
People
- Communication
- Fatigue
- Human Error
- Not Authorized
- Not Competent
- Poor Decision
- Distractions
- Hazard Awareness
- Medication
- Manual Handling
- Pedestrians
- Stress
-
Work Environment
- Access / Interactions
- Confined Area
- Foreign Objects
- Lighting / Visibility
- Poor Ergonomics
- Sun Exposure
- Air Movement
- Energy Release
- Gravity
- Lightning
- Pressure (fluid / air)
- Vibration
- Body Positioning
- Fumes / Vapours
- Ground Stability
- Noise
- Sharp Objects
- Weather Conditions
- Chemicals
- Falling Objects
- Housekeeping
- Oils / Greases
- Slip / Trip / Falls
- Work Surface
-
Environmental
- Air Emissions
- Land Disturbance
- Spills / Chemical
- Waste Disposal
- Dust
- Noise
- Water Control / Runoff
- Wildlife
-
Equipment / Plant / Machinery
- Caught Between
- Hydraulic Injection
- Moving Parts
- Pressure (fluid / air)
- Construction
- Isolation
- Object Weight
- Stored Energy
- Electricity
- Maintenance
- Poor Controls
- Tooling
- Guarding
- Modifications
- Poor Signage
- Traffic Interactions
-
• Existing Controls
-
• Initial Risk Analysis
-
Consequence
-
Likelihood
-
Additional Controls
-
Additional Controls
JSA Acknowledgement & Completion
-
Status of the JSA
-
JSA conducted by (Name and Signature)
-
NOTE: If there are changes or if the JSA is incomplete, REVIEW the whole JSA and initiate the Task Review below.
Task Review
-
Were any additional hazards identified while doing the task?
-
Were hazards and controls have been added to the JSA form?
-
• Has a copy been filed in the central filing system?
-
• Is a Permit to Work required?
-
• Does a procedure need amending as a result of this JSA?
-
• Does the JSA trigger a training need?
-
Reviewed by Area / Manager (Name and Signature)
-
Supervisor Authorization (Name and Signature)
-
Personnel Details
Click "Add Personnel" to enlist names & signatures of those who were involved with the JSA
Personnel
-
Name and Signature
-