Information
-
BCO No.
-
Client / Site
-
Conducted on
-
Inspected by
-
Location
-
Sub-Contractor Name
-
Is Sub-con on site ?
Foundation Slab
-
Is the slab set out correctly as plan ?
- Yes
- No
- N/A
-
Is DPM been used ?
- Yes
- No
- N/A
-
2. Ensure formwork height is as per surveyor set out FFL height ?
- Yes
- No
- N/A
-
Is the form work at same height level?
-
Is the DPM and rebar clean and free from soil and loose polystyrene?
- Yes
- No
- N/A
-
Is the rebar grade & type used properly ?
- Compliant
- Non-Compliant
- N/A
-
Is the thickening constructed correctly in depth and width? Are enough rebar used?
- Yes
- No
- N/A
-
Is the thickening constructed in correct location? Measure out all load bearing walls to confirm.
- Yes
- No
- N/A
-
Is the trimmer bars placed correctly ?
- Yes
- No
- N/A
-
All Ground Beams - are in correct location ?
- Yes
- No
- N/A
-
All Pads - are located under SHS or point load. Ensure pad & SHS concrete footing dimension (ensuring its W x H x L) are marked and dug correctly before concrete ?pour.
- Yes
- No
- N/A
-
Has the proper mesh been installed ?
- Yes
- No
- N/A
-
Have the proper chairs been installed under the mesh? Enough concrete cover ?
- Yes
- No
- N/A
-
Are all the Plumbing stub up's installed and properly located?
- Yes
- No
- N/A
-
Drainage pipes - are fully covered by sleeves ranging from gap7 / elbow section to exposing end. Seal openings tightly with waterproofing tapes ?
- Yes
- No
- N/A
-
Rebars around pipes are bent correctly. Practice good standard, 2 45’ bends instead of single 90’, Rib edge and edge beam details refer to below. Leave at Least 35mm space between reinforcing bars and pipes ?
- Yes
- No
- N/A
-
Is all electrical installed and properly located? Kitchen Island?
- Yes
- No
- N/A
-
Is Hotedge being installed corrrectly ? If is a HE extra, brick veneer or with base ?
- Hotedge Extra
- Hotedge Brick Veneer
- Hotedge with base
-
Is there a joinery rebate ? Is the rebate allowed at the correct location ? and as per joinery installation guide ?
-
Take picture of any violations.
Signatures
-
Building Inspector's Signature
-
Sub-contractor Signature