Title Page
-
Document No.
-
Edgewater Manufacturing HSEQ Audit
-
Client / Site
-
Conducted on
-
Prepared by Peter Gregg
-
Location
-
Personnel
Safe system of work
Safe system of work
-
Corrective preventative actions closed from last visit?
-
Method statements and risk assessments in place and signed?
-
Machinery training records on file?
-
Sub contractor safety information available on site? This will include method statements, risk assessments and competency records.
-
Induction records in place for all operatives on site? As part of the audit a sample will take place to confirm compliance.
Performance Management Records
Management
-
SC060 planning schedule in use?
-
Drawings in use? Latest revision in use and on the server? Check to take place.
-
Accident Incident monitor completed by manufacturing manager for previous month and emailed to health & safety department?
-
Sub contractors approved? - sample to take place.
-
SF001 project commencement form completed? - sample to take place. (Only needed for supply & fit contracts)
Health & Safety
-
Clock in cards & sign in book in use including management signed in. (Check to take place)
-
Plant certificates / PUWER inspections in place for equipment and dashboard monitor (SC040) up to date?
-
PUWER weekly inspections in place (SC 001 12)
-
Floor mounted Machines adequately secured/fixed?
-
Evidence that portable appliance testing has been completed for tools & equipment.
-
Vehicle management records completed for Edgewater vehicles (Citroen van & Lorry) & emailed to health and safety department?
-
Toolbox talks being completed? must be minimum of fortnightly.
-
Accident investigation records?
-
Permit to work records in place for elements of work such as Hot Works & Work @ Height including stepladder checks?
-
Statutory safety signage in place for the project? (Law poster)
-
Training records available for operatives on site to include Joiner CSR / CSCS cards.
-
Welfare facilities compliant?
Environmental
-
CoSHH information in the form of safety data sheets and assessments completed for all products on site?
-
Waste transfer notes, consignment notes, season tickets and recycling in place as per company procedures?
-
SC100 Paint booth filter records on file?
-
Records of sprayers mask filters being changed?
-
Oil monitor reading taken?
-
Particulate survey completed?
-
Noise survey completed & action taken?
-
Spill kit in place & trained operatives?
-
General condition of LEV ductwork.
Quality
-
Job files in use for all live jobs? Inc Despatch note included to monitor quality.
-
QM110 workshop daily production record in use with job description being completed? Sample to take place.
-
Evidence of document control procedure followed for project drawings and data on project site?
-
Delivery dockets available for materials on site with evidence of check and sign off?
-
Evidence of client communication showing meeting minutes, feedback, dissatisfactions etc?
Site Conditions
Site Conditions
-
Access & egress controlled sufficient?
-
Site security / fencing sufficient?
-
Fire alarm cert on file?
-
Fire risk assessment in place and up to date?
-
Fire exits marked & unobstructed?
-
Fire plan and fire wardens displayed?
-
Fire extinguishers in place & serviced? (Sample to be checked to confirm service)
-
Yard maintained?
-
First aid point readily accessible? (Including a trained 1st Aider?)
-
First aider identified?
-
Parking / Delivery area identified / sufficient?
-
PPE compliance? (Including company branding)
-
Noise / Light pollution?
-
Suitable designated smoking area?
Audit acceptance
-
Manufacturing Manager
-
Select date
-
Auditor
-
Select date