Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Time of Audit
-
Contractor Observed
- C.B Strain
- Darlind
- E.W. Finley
- Elmsford Sheet Metal
- Perreca Electric
- PCI
- Rondout Electric
- Techtron
- TFS Electrical
- TFS Mechanical
- U.S Test & Balance
- Westech Process Solutions
- M+W U.S., Inc.
-
Inspection by
- Scott Cashin
- Raven Castelli
- Peter Irion
- Nakobee Johnson
- Derek Moss
- Robert Nytes
- Brian Tulip
- Melvin Whitmore
Housekeeping
-
Trash disposed of properly
-
Passageways / walkways clear
-
Work areas neat. Tools / material organized
-
PVC glue containers disposed of properly
-
Carts clean & free of debris & organized
Fire Protection
-
Extinguishers in place and the appropriate size and type
-
Flammables stored in flammable storage cabinets
-
No cardboard, paper or rags stored in flammable cabinet
Chemicals / Gases
-
Containers clearly identified with hazard warning
-
Proper storage practices observed
-
Gas cylinders stored properly & company information
Tools
-
General condition
-
Assured grounding tested
-
GFCI in use
-
Extension cord condition
Ladders
-
General condition
-
Employee using ladder correctly
-
Access to ladder uncluttered
Fall Protection
-
Harness free of defects / damage
-
Proper lanyard use
-
Lanyard attached properly
Floor Openings / Barricades
-
Floor openings barricaded with guardrail system
-
Barricade secured to floor properly
-
Chain opening on barricade hooked
Personal Protective Equipment
-
Using basic PPE (glasses,hard hat, safety shoes, gloves)
-
Proper PPE during hot work (electrical & mechanical)
-
Fall protection being used
-
Respirators
Site Trucks / Forklifts
-
General conditions
-
Regular vehicle inspection performed
-
No riders observed except operator
Welding / Cutting
-
Cylinders secured in upright position
-
Caps installed when not in use
-
Hoses and lines inspected before use
Lock-Out / Tag-Out
-
Employees trained
-
Lock / Tag applied by person performing work
Hot Work
-
Hot work permit signed and displayed
-
All required PPE being used
-
Procedure followed as described on permit
Emergencies
-
Aware of IBM emergency phone number
-
Aware of location of muster point in case of emergency
-
Aware of east and west corridors in B323 are safe zones
-
Aware of building evacuation alarm
-
Aware of phone and exit locations near work area
Pre Task Plan
-
PTP filled out for the day
-
Hazards identified and mitigated
-
PTP is in work area
-
Appropriately signed
-
Additional Comments
-
Contractor EHS Representative
-
M+W EHS Representative