Title Page
-
Travis Perkins Sign off document
-
Job number
-
Store number
-
Store name
-
Start travel time
-
End travel time
-
Time on site
-
Time off site
Works
-
Attending engineers
-
Has BT business hub been installed
-
If NO please state why
-
BT business hub serial number
-
Hub Photo of placement
-
Has the power injector been installed
-
If NO state why
-
Power injector serial number
-
Has the AP been installed
-
If NO please state why
-
AP serial number
-
AP MAC address
-
AP photo
-
AP IP Address
-
Has a speed test been run
-
If NO please state why
-
Screen shot of speed test
-
Has TC55 been configured
-
If NO state why
issues
-
Issues
-
Issues photo
-
Issues resolved
-
Issues resolved photo
-
Comments
sign off
-
Lead engineer
-
Disclamer: By signing this document, you have tested the wireless access point and are happy with the installation and coverage that has been provided.
-
Client Sign off