Title Page
-
Conducted on
-
Prepared by
-
Site conducted
-
Level
- Ground
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
- 8th
- 9th
- 10th
- 11th
- 12th
- 13th
- 14th
-
Plot Number/House Number
Drawing
-
Are services installed to the latest issued electrical drawings
-
Drawing reference number
First Fix - Cupboard
-
Are back boxes for sockets, spurs and data installed, set to correct location and protruding adequately
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Is lighting wired correctly and set out to the correct location
-
Is a fused spur ready for the water heater or HIU
-
Is the consumer unit wired correctly and set out in the right location
-
Is a spur ready for an MVHR unit
First Fix - Kitchen
-
Are back boxes for sockets and spurs installed, set to correct location and protruding adequately
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Is lighting wired and set out to the correct location
-
Are the smoke/heat detectors and external beacons wired correctly and set out in the correct location
First Fix - Living Room
-
Are back boxes for sockets and spurs installed, set to correct location and protruding adequately
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Is lighting wired and set out to the correct location
-
Are the smoke/heat detectors and external beacons wired correctly and set out in the correct location
-
Is a power supply ready for an MVHR controller
First Fix - ELV Services
-
Is the Data wired correctly and set out to the correct location
-
Do ELV cables have adequate metal fixings
-
Is the Telephone wired correctly and out to the correct location
-
Do ELV cables have adequate metal fixings
-
Is the Door Entry wired correctly and set out to the correct location
-
Do ELV cables have adequate metal fixings
-
Is the TV wired correctly and set out to the correct location
-
Do ELV cables have adequate metal fixing
-
Is the Fibre cable correctly wired and set out to the correct location with a minimum of 2meters of slack
-
Do ELV cables have adequate metal fixing
Heating thermostat/UFH
-
How is the House/Apartment heated
-
Are spurs installed in the correct location
-
Are thermostats wired correctly and set out in the correct location
- Kitchen
- Living Room
- Bathroom
- En-suite
- Bedroom 1
- Bedroom 2
- Bedroom 3
-
Are thermostats wired correctly and set out in the correct location
First Fix - Bedrooms
-
Are back boxes for sockets and spurs installed, set to correct location and protruding adequately
- Bedroom 1 - Yes
- Bedroom 2 - Yes
- Bedroom 3 - Yes
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Is lighting wired and set out in the correct location
First Fix - Bathrooms
-
Are back boxes for Shaver/Vanity and spurs installed, set to the correct location and protruding adequately
- Bathroom - Yes
- Bathroom 2 - Yes
- Shower Room - Yes
- En-suite - Yes
- W/C - Yes
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Are all cables cut to adequate length, marked and taped
-
Do LV cables have adequate metal fixings
-
Are all cables entering metal track/plasterboard according to requirements
-
Do LV cables have adequate metal fixings
-
Is lighting wired and set out to the correct location
-
Is extractor fan and isolator wired up and set out in the correct location
First Fix Completion
-
Any additional comments
-
Customer Foreman
-
Customer Foreman Signature
-
West Coast Foreman