Title Page
-
Conducted on
-
Prepared by
-
Site conducted
-
Level
- 1st
- 2nd
- 3rd
- 4th
- 5th
- 6th
- 7th
- 8th
- 9th
- 10th
- 11th
- 12th
- 13th
- 14th
-
Plot Number/House Number
Drawing
-
Are services installed to the latest issued electrical drawings
-
Drawing reference number
Hot & Cold Pipework
-
Check services pipework run outs are correct sizes (15/22)
-
All clipping distances to meet the mechanical spec/ installation guides
-
All pipework penetrations through walls are to have sleeve made of the same type of material
-
Are all Uponor pipework correctly crimped
-
Are all open ends capped
-
Is pipework marked Hot & Cold
-
First fix complete
-
Pressure test carried out an witnessed by customer site manager
-
Customer signature
Drainage Services
-
Is all pipework undamaged and correctly installed as per the manufactures instructions
-
Are all the pipe clips/rubber lined clips installed at the correct spacing and securely fixed to the fabric of the building
-
Are the Boss pipes and Branches installed at the correct heights
-
Are the Access pipes installed at the correct height and orientation
-
Is the 40mm waste to the basin installed at the correct height and centre and open ends capped off
-
Is the 40mm waste to the shower/bath installed at the correct height and center and open ends capped off
-
Is the 40mm waste to the sink installed to the correct height and centre and open ends capped off
-
Is the 40mm waste to the HIU installed in High Temperature pipework and at the correct height and centre
Completion
-
West Coast Foreman