Signal Modification Details
-
Electrical / Civil Construction Team Leaders / Contractor
-
Conducted on
-
Audited by
General Requirements
GENERAL REQUIREMENTS
-
NOTE:- AUDITEE TO PROVIDE PHOTOGRAPHIC EVIDENCE OF DEFECT RECTIFICATION
-
1. GENERAL REQUIREMENTS
-
This audit checks for compliance with an IMS procedure?
-
1.1 IMS Procedure Number?
-
1.2 Did the audited task comply with the related procedure?
-
1.3 Has SIR or Rectification Notice been issued? Record number here?
-
2. Document and Plan Requirements?
-
2.1 Accurate "As Constructed" plan included in returned documentation?
-
2.2 Detailed Certificate of Test signed off by installer
-
2.3 All construction changes approved in writing by the designer and marked up on plans?
-
2.4 Shallow conduit depths marked up on As Cons?
-
2.5 Earth electrode location marked on all plans?
-
2.6 Location of earth electrode?
-
2.7 Ducting and pits completed as per plan?
-
2.8 Signals hardware completed as per plan?
-
2.9 Loops installation, location and connections as per plan?
-
2.10 Pole /post alignments as per plan?
-
2.11 Conduit road crossings as per plan?
-
2.12 Line marking as per plan?
-
2.13 Existing pits and hardware accurately identified on plans?
-
2.14 All documents are current IMS versions?
-
3. Electrical Compliance?
-
3.1 Were mains upgraded? Note size here.
-
3.2 Earth electrode is installed and complies with BSD 4035 and applicable version of AS/NZS:3000?
-
3.3 Main earthing conductor is 6mm2 and a Main Earth label is attached at electrode connection?
-
3.4 Detailed and signed Certificate of Test for controller modifications affixed to door?
-
3.5 Multicore terminations verified at controller and posts?
-
3.6 Field wiring is loomed inside controller?
-
3.7 No bare copper exposed at any terminals - AS/NZS:3000 Cl 3.7.1?
-
3.8 Disused cables removed or terminated - AS/NZS:3000 Cl 1.5.11.4?
-
3.9 Controller "E" block LV terminal is red?
-
3.10 "Push button before use" sticker affixed to socket outlet in controller?
-
3.11 Spare cores effectively earthed in controller?
-
3.12 Controller conduits sealed as per BSD 4035?
-
3.13 "E" and "C" markers installed as per BSD 4015?
-
3.14 Conduit depths comply with BSD 4015 (LV) and BSD 4016 (ELV) or have been approved?
-
3.15 Shallow conduits concrete encased, approvals supplied and shallow conduit markers installed as per BSD 4015?
-
Comments / Other?
Controller
CONTROLLER
-
Controller Type?
-
QTC
-
Installed Modules:-
Command Module CM3264
Spare x 2
Loop Input Module LIM 1616DW
Signal Group Module x 4 SGM 524
Spare
Power Supply Module PSM 100 -
Eclipse
-
Installed Modules:-
Processor Card CPM-1a
Spare x 2
Detector LDM-416
Lamp Control x 2 LCM-8
Power Supply Module PSM -
Tyco PSC3
-
Installed Modules:-
Processor Plus
Spare
Power Supply
Spare
Detector PD 212
Detector PD 216
Lamp Control -
Philips PSC Mk2
-
Installed Modules:-
Processor
Spare
Power Supply
Spare
Detector PD 212
Power Interface
Lamp Control Low Power
Lamp Supply -
ATS ATSC4
-
Installed Modules:-
Power Supply
4 S.G. O/P PWR TC400-240
Detector
Spare R8080
EIM 16CH TC400-65
Spare x 2 R8080
Logic Processor TC400-45 -
Check this box to list installed equipment / connections
-
LCM installed?
-
LCM make and model?
- BCE 2131C
- BCE 2151C
- BCE 2152
- BCE 2152C
- BCE 2131
- BCE 2151
- TIC
- BCE 2004C
-
Modem make and model?
- MuLogic ADSL 2401
- MuLogic ADSL 2401S
- IEI-ECW-281B-D525
- Cybertec CDR-790SEU
- Cybertec 2100
- LINX EIRM-EXTEND
- Cybertec CDM-882SEU
-
Network Switch make and model?
-
Comms connected to?
-
Linking connected?
-
Connected to SCATS?
-
Bluetooth installed?
-
Details of equipment not listed above
-
4. Other controller items checked?
-
4.1 Controller installed and connected to power?
-
4.2 Connection type?<br>NOTE:- Construction Manager to be urgently advised of unfused supplies.
-
4.3 Earth Terminal Bridging Link installed and tightened securely? (QTC controllers)
-
4.4 Controller operation checked on site?
-
4.5 Vehicle and pedestrian input operation tested?
-
4.6 Loops numbering in controller complies with BSD 4012 notes 6 & 7?
-
4.7 Loops drain wires effectively earthed in controller?
-
4.8 Screed available and matches plan in controller?
-
4.9 LCB overlay reflects current signal groups?
-
4.10 ADSL comms surge diverter installed/upgraded?
-
4.11 Site ID plate fitted?
-
4.12 Auxiliary power supplies installed for VID and modem?
-
4.13 Top hat installed and connected?
-
4.14 Additional circuit breakers installed?
-
4.15 All LV switchgear accurately labelled?
-
4.16 Generator panel installed?
-
4.17 75mm slab installed around controller base as per BSD 4035?
-
5. Signal and Controller Operation?
-
5.1 Vehicle lanterns flashed?
-
5.2 Vehicle lanterns run?
-
5.3 Ped lanterns / countdown timers flashed?
-
5.4 Ped lanterns / countdown timers run?
-
5.5 Countdown timer numbers all light up correctly?
-
5.6 P/B inputs checked?
-
5.7 P/B inputs driving correct group?
-
5.8 Loop detectors checked?
-
5.9 Loop inputs checked?
-
5.10 Loop inputs driving correct group?
-
5.11 A/T relay operational?
-
5.12 A/T operation checked?
-
5.13 Linking communicating?
-
Comments / Other?
Hardware Installation
HARDWARE INSTALLATION
-
6. Posts / poles / footings checked?
-
6.1 Post mountings and footings as per BSD 4151?
-
6.2 Median posts fitted with reflective tape as per BSD 4151 and CRU requirements?
-
6.3 Joint Use pole specification as per BSD 4123?
-
6.4 Mast arm specification as per BSD 4124?<br>NOTE:- 6.5m is DTMR type.
-
6.5 Rate 2 earthing as per BSD 4123, 4124 & Energex PLCM page 1-2-833?
-
6.6 Joint Use poles numbered to Energex requirements?
-
6.7 Two sources of supply stickers affixed to JU poles as per BSD 4121?
-
6.8 JU pole signal junction boxes as per BSD 4102?
-
6.9 Post multicore terminations as per BSD 4101 (finial) 4102 (J-box)?
-
6.10 Post multicore terminations verified?
-
6.11 Redundant holes in posts, outreaches and enclosures plugged?
-
7. Lanterns / peds / pushbuttons checked?
-
7.1 Brand(s) of lanterns on site?
- ATS
- AEI
- Braums
- Other - add details in Comments
-
7.2 Ground lantern sight board material?
-
7.3 Vehicle lanterns mounted as per BSD 4121?
-
7.4 Quick disconnect lamp isolation installed for new / replacement lanterns / peds?
-
7.5 Countdown timers installed at correct height as per BSD 4122?
-
7.6 Lantern locking washers installed as per BSD 4107 for new / replacement lanterns / peds?
-
7.7 Vehicle lanterns aligned to appropriate traffic lanes?
-
7.8 Vehicle lanterns visible?
-
7.9 Vehicle lantern cowls (visors) as per plan?
-
7.10 Lantern doors fully closed?
-
7.11 Ped lanterns and push buttons as per plan?
-
7.12 Ped lantern and push button mounting and positioning as per BSD 4122?
-
7.13 Ped lanterns aligned to centre of associated crossings?
-
7.14 Ped lanterns visible?
-
7.15 Ped lantern doors fully closed?
-
7.16 Push button alignment as per BSD 4122?
-
7.17 A/T driver mounting and positioning as per BSD 4122 (post) 4121 (JU)?
-
7.18 Ped/cyclist stickers affixed as per BSD 4122?
-
7.19 All cabling effectively secured to post?
-
7.20 Finial retaining straps firmly attached to finial cap?
-
Comments / Other?
Civil
CIVIL
-
8. Pits and Conduits?
-
8.1 Pit lids compliant with BSD 1012 & 4034 and fitted correctly?
-
8.2 Pit lids show correct designation and BCC logo or lettering?
-
8.3 Pits and pit lids not damaged or a trip hazard?
-
9. Posts, Poles?
-
9.1 Poles and foundations comply with relevant standard drawings?
-
9.2 Pole bases grouted as per BSD 4121 (JU) or BSD 4151 (post)?
-
9.3 Post setback as per BSD 4151 (pedestal) or 4122 (short post)?
-
9.4 JU pole setback as per Energex Public Lighting Construction Manual?
-
10. Loops?
-
10.1 Loop terminations tight?
-
10.2 Loop saw cut entry as per BSD 4011?
-
10.3 Loops cut and sealed as per BSD 4012?
-
10.4 Loop lead-ins jointed and numbered as per BSD 4012 notes 6 & 7?
-
11. Footpath, Kerb, Roadway Checks?
-
11.1 Kerb ramps installed as per BSD 5233 including tactile ground surface indicators?
-
11.2 Landscaping completed
-
11.3 Linemarking completed?
-
11.4 Footpaths, roadway and kerbs reinstated?
-
11.5 Intersection left clean and tidy?
-
Comments / Other?