Title Page
-
Site conducted
-
Description
-
Project
-
Floor
-
Site Address
-
Date and Time
-
Prepared by
-
All Metal Boxes for Accessories Installed at the correct height?
-
All Metal Accessories Boxes & supports fixed securely?
-
All Cables within walls in designated cable zones or suitably protected?
-
All Electrical Accessories positions are in-line with most up to date drawings?
-
All wiring, supports and accessories are co-ordinated with other services?
-
Cables not in accessory boxes state what height to be brought out?
-
Grommets Installed to any metal cable entries?
-
Any Cables passing through metal stud work suitably protected with grommets?
-
Pattress’ installed where required?
-
Area realised for next activity
This check sheet has been issued with the purpose to progress “The Works”.
All work is subject to final inspection and client approval at the date of the project handover
This check sheet is flexible to allow full checking process to all parties. -
Tap on '+' to add new Sign Off below.
Sign Off
-
Print Name and Signature
-
Company Name
-
Job Title