Title Page

  • Conducted on

  • Prepared by

Electrical

  • Main Feeder 1 meter Main authoritiy meter 1 peak usage

  • Main Feeder 1 meter Main authoritiy meter 1 off peak usage

  • Main Feeder 2 meter Main authoritiy meter 2 peak usage

  • Main Feeder 2 meter Main authoritiy meter 2 off peak usage

  • 1 Phase 2 MSB Feeder No.1 (9-VCR2, 9B -Former GTR and AHU 10 to 13))

  • 1.1 NSP-1B 400A

  • 1.1.1 ODS Lighting and Power (32A)

  • 1.1.2 L2 to L4 Warehouse Front and Back Corridor Lighting(BAT) = 2204Kwh

  • 1.2 Carpark 70% lighting Monthly KWH = 1797 under common

  • 1.3 AHU7A

  • 2 AirCon Main Switch - Chiller Room

  • 2.1 AHU6-Cut Rag

  • 3 Secondary Manufacturing Dept-SMD 1(SMD Machine Lighting and Power)

  • 4 Boiler/Compressor A3/Vacuum Pump 1,2&3

  • 5 Phase 2 MSB Feeder No.2(Admin Block & New Filter Rm)

  • 5.1 New Filter Room - Sub of Ph2 MSB Feeder 2(SMD2 Machine, Lighting and Power)

  • 5.1.1 AHU 8(SMD2 Right Side)

  • 6 SMD Pneu Fan 1, Odour 1 and PMD Dust Collector

  • 7 SSB-Primary Manufacturing Dept-PMD

  • 8 Generator Room (All E-source)(10% E-Source L&P for all Area and Essential Equipment)

  • 8.1 Singtel meter

  • 8.2 M1 meter

  • 9 SSB-G+N (PMD Lighting and Power)

  • 10 DB-N-Poll-A (CDS1 and Odour 2)

  • 11 DB-N-FGS

  • 12 AirWasher (SMD AHU 7)

  • 14 Compressor Room(A1,A2 and A4)

  • 15 SSB - AHU (AHU 1-5)

  • 15.1 AHU3

  • 15.2 AHU4

  • 16 Odour 3, CDS2 & CDS3

  • 17 3rd Palletizer Robot (SMD) and FGS Aircon(not running)

  • 18 PMD New Duct Collector

  • 19 SMD2 Home Main No. 1

  • 20 SMD2 Home Main No. 2 (SMS2 Machine, Lighting and Power)

  • 21 Ancillary SMD2 Home (1 Comp and 2 Vacuum) New Generator Room

  • 22 CDS SMD2 Home (1 CDS and 1 Pneu) - for Tenant Forklift Charging

  • 23 AHU 8A(SMD2)

  • 24 Arang Area 2(Warehouse)

  • 25 Reefer Container Loading Bay

  • 26 SMD2 New 800A DB(SMD 2 Machine, Lighting and Power also Ahu 8B-SMD2 and AHU 8C-WMS)

  • 27 Unmetered others Micellaneous(WH Rooftop Pump and L&P, Eng WS L&P, Sw room AC, L&P, Vent, Ex Fan, Sw Board Ex Fan, PMD Office L&P, some common area L&P etc)

Water

  • M1 Main meter

  • M1-1 Main sub meter

  • M2 Roof Top Ex- Booster Pump

  • M2.1 Rooftop Chiller Cooling Tower

  • M2,2 Ancillary Plant CT

  • M2.3 Boiler Room

  • M2.4 Eng Block Odour Rooftop

  • M2.5 Treatment Plant

  • M2.6 SMD1 Glue Room

  • M2.7 AHU7

  • M2.8 Warehouse Toilet S1,S2,S3&S4

  • M2.9 AHU 5

  • M2.10 Flavouring Kitchen

  • M2.11 Garden Tap, AHU Room Tap, PMD Area and Eng Block Toilet(40%)(Unmetered areas)

  • M3P Admin Rooftop New 1 from Booster Pump

  • M3G Admin Rooftop New 2 by Gravity

  • M3.1 Canteen & SMD Toilet

  • M3.2 Warehouse ( Former GTR)

  • M3.3 Warehouse and Arang

  • M3.4 Carpark/SMD2/QA/Ancillary2/Koi Pond/Ph2 Garden Tap

  • M3.41 SMD2 Glue Room

  • M3.42 Ancillary Room 2 (Near Main Guard House)

  • M3.43 Fish Pond and Garden Tap (Unmetered)

  • M3.5 Admin Block (Unmetered Areas)

  • M4 Fire System (Unmetered Areas)

  • M5 Odour Recycle Water

  • M6 Chiller CT Bleeding

  • M7 Rain Water

  • M8 Odour Recycle Water (Rooftop)

  • M9 Rain Water (CT)

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.