Title Page

  • Site conducted

  • Conducted on

  • Prepared by

  • Location

Inspection Information

  • Location / Area:

  • Area Supervisor:

Inspection Information

  • Approved SWMS in place and communicated

  • EWP checked and authorised for use ON site

  • Daily inspections of items listed in its log book or checklist completed and controls tested by the operator

  • Log book kept and retained on the working platform

  • Personnel operating Elevating Work Platforms (EWP) suitably trained and assessed as competent e.g. Elevating Work Platforms <11m Yellow Card or acceptable equivalent / Boom type Elevating Work Platform boom length 11 metres or more relevant High Risk Licence

  • Suitable barricades erected and adequate warning signage displayed "Danger Men Working Overhead"

  • Barricaded area prevents access to other workers in the area and protects the area underneath the working platform

  • EWP set up on firm and level ground

  • Outriggers extended (if applicable to type of EWP)

  • EWP not operating within 'zone of influence' of the edge of an excavation/trench/open precast concrete cable trench or drain without providing approved shoring or cover plates

  • EWP not operating closer than six (6) metres to power lines unless such lines have been isolated

  • EWP free of debris, waste, or unnecessary materials and equipment

  • Precautions in place to prevent tools or equipment from falling out of the working platform

  • Weather conditions suitable for EWP operation in accordance with manufacturer's instructions

  • Safe Working Load (SWL) marked on EWP and SWL of the working platform not exceeded

  • Safety Observer/Spotter available at all times to provide additional guidance when EWP is travelling

  • Fall arrest / restraint system worn and attached to a suitable anchorage point (boom type working platform)

  • Personnel required to use fall protection equipment trained in its specific use

  • EWP inspected by a qualified mechanic / fitter at least every 3 months

Corrective Actions

  • Action

  • Action

  • Action

  • Action

  • Action

Inspection Team

  • Name:

  • Name:

  • Name:

  • Name:

  • Name:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.