Information
-
STORE NAME.
-
STORE OR PROJECT NUMBER
-
SITE ADDRESS
-
TYPE OF PROJECT
- NEW STORE
- REFURBISHMENT
- MINOR WORKS
- PLANNED CAPEX
- EXTENSION
- SERVICE PROJECT
-
END OF WARRANTY DATE
-
BRAND
-
PREPARED BY
-
CONDUCTED ON
-
NOTES OR COMMENTS
-
INSTALLING CONTRACTOR
-
CONTRACTORS REPRESENTATIVE AT INSPECTION
-
PROJECT MANAGER
-
R&M WORKS
Overview of basic requirements
-
All plant has been recommissioned to settings as accepted at project completion
-
Report including graphs and service calls history provided
-
Refrigerant and oil levels topped up to maintain optimum levels
-
Documentation provided to prove oil tests conducted in accordance with section 1.7.2
-
All driers replaced
-
All oil filters replaced - including oil separator if coalescing type fitted
-
Check pressure drop across suction filter does not exceeded 10kPa - confirm filters replaced during 26 week maintenance.
-
All condensers have been thoroughly cleaned
-
All plant and surrounding area degrease and cleaned as required
-
Drip trays thoroughly cleaned
-
Switchboards - confirm ventilation fans and filters have been cleaned, screw connections and terminal strips have been checked and tightened.
-
Thermal scan of switchboards provided
-
Shop floor leak detectors checked - confirm alarm aspect working correctly.
-
Plant room leak detectors checked - confirm alarm aspect working correctly
-
Cold room and prep area leak detectors checked - confirm alarm aspect working correctly
-
All case ventilation fans cleaned - confirm all working correctly.
-
Confirm correct operation of all night blinds
-
Confirm correct operation and set up of site PC's
-
Confirm correct operation of all cold room door indicator lights
-
Plant room & condenser deck area - confirm any rusting pipe clips have been replaced.
-
All cabinets checked - confirm no ice build up, no missing plastic bungs, loose panels, mis-aligned or loose kick plates, sharp edges etc.
-
All cold room and prep area FDC's have been thoroughly cleaned
-
Confirm cold room door hardware is correctly adjusted and door gaskets in tact.
-
Confirm correct vapour seal integrity maintained in all cold rooms - no rust marks or condensate residue from ceiling or wall joins.
Other general items
- Item
-
SIGN OFF
-
Add signature