Information

  • STORE NAME.

  • STORE OR PROJECT NUMBER

  • SITE ADDRESS

  • TYPE OF PROJECT

  • END OF WARRANTY DATE

  • BRAND

  • PREPARED BY

  • CONDUCTED ON

  • NOTES OR COMMENTS

  • INSTALLING CONTRACTOR

  • CONTRACTORS REPRESENTATIVE AT INSPECTION

  • PROJECT MANAGER

  • R&M WORKS

Overview of basic requirements

  • All plant has been recommissioned to settings as accepted at project completion

  • Report including graphs and service calls history provided

  • Refrigerant and oil levels topped up to maintain optimum levels

  • Documentation provided to prove oil tests conducted in accordance with section 1.7.2

  • All driers replaced

  • All oil filters replaced - including oil separator if coalescing type fitted

  • Check pressure drop across suction filter does not exceeded 10kPa - confirm filters replaced during 26 week maintenance.

  • All condensers have been thoroughly cleaned

  • All plant and surrounding area degrease and cleaned as required

  • Drip trays thoroughly cleaned

  • Switchboards - confirm ventilation fans and filters have been cleaned, screw connections and terminal strips have been checked and tightened.

  • Thermal scan of switchboards provided

  • Shop floor leak detectors checked - confirm alarm aspect working correctly.

  • Plant room leak detectors checked - confirm alarm aspect working correctly

  • Cold room and prep area leak detectors checked - confirm alarm aspect working correctly

  • All case ventilation fans cleaned - confirm all working correctly.

  • Confirm correct operation of all night blinds

  • Confirm correct operation and set up of site PC's

  • Confirm correct operation of all cold room door indicator lights

  • Plant room & condenser deck area - confirm any rusting pipe clips have been replaced.

  • All cabinets checked - confirm no ice build up, no missing plastic bungs, loose panels, mis-aligned or loose kick plates, sharp edges etc.

  • All cold room and prep area FDC's have been thoroughly cleaned

  • Confirm cold room door hardware is correctly adjusted and door gaskets in tact.

  • Confirm correct vapour seal integrity maintained in all cold rooms - no rust marks or condensate residue from ceiling or wall joins.

Other general items

    Item

SIGN OFF

  • Add signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.