Title Page
-
What is the Brand?
- All Bar One
- Browns
- Castle
- Crown
- Ember
- Harvester
- Miller & Carter
- Nicholson's
- Oaktree
- O'Neills
- PCDG
- Sizzling
- Toby
- Tokyo
- VPK
- Vintage
Engineer Quality Control
-
Did the engineer arrive on time as agreed?
-
Did the engineer introduce himself and show his ID card?
-
Did the engineer explain the extent of the works?
-
Did the engineer complete the RMRA?
-
Did the engineer work in a safe manner, with minimum disruption to trade?
-
Was the engineer polite and professional?
-
Was the engineer tidy whilst working and clear up after himself?
On Site Assessment
-
Works carried to an acceptable standard?
-
Add media
-
Correct installation method been employed?
-
Add media
-
Does the work meet the current regulations?
-
Add media
-
Is the repair satisfactory?
-
Add media
-
Is the work safe?
-
Add media
-
Was the job a first time fix?
-
Add media
-
Follow on works raised?
-
Were the follow on works really necessary?
-
Correct certificates completed?
-
- Training Required on filling out Certificates
-
Paperwork satisfactory?
Faults Identified
-
Faults
-
Additional Comments
-
Overall rating for the works
-
Electrical Inspector sign off