Title Page

FULLY COMPLETE THIS SECTION BEFORE WORK COMMENCES

  • Contractor

  • Contractor Ref:

  • Mitchell's & Butlers Order Number

  • House:

  • BUN Number:

  • Brand:

  • Date & Time of Call:

  • Call Placed By:

  • Problem:

  • Response Requested:

  • Repair Type:

  • List Nature of Call:

  • Arrival on Site:

  • Full Job Description:

Health & Safety Requirements - before work commences, have you and the Duty Manager discussed;

  • The Requirements of The Work:

  • Relevant Health & Safety Precautions and

  • Inspected The House Asbestos Register:

  • Job Risk Rating (refer to guidance)

FILLED IN BY CONTRACTOR AFTER WORK IS COMPLETED

  • Works Completed:

  • Hours on Site:

  • Full Repair:

  • Temporary Repair

  • AOV: (OR call out charge for no works or abortive call)

  • Fixed Price: (for ARS or PPM works)

  • Fault Code:

Time & Materials:

  • No of Operatives

  • Hours on Site:

  • Rate Per Hour:

  • Materials Used:

  • Plant Used:

  • Box A:

  • Asset Number:

  • Make & Model of Equipment:

  • Engineer Signed:

COMPLETED BY THE PERSON IN CONTROL OF THE PREMISES

  • THE ABOVE WORKS HAVE BEEN COMPLETED TO MY SATISFACTION I hereby request MAB to pay (contractors name)

  • The Sum Of £ (as box "A" above)

  • Print Name;

  • Position Held:

  • Reason if Declined To Sign:

  • How Do You Rate The Quality & Service:

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.