Title Page
FULLY COMPLETE THIS SECTION BEFORE WORK COMMENCES
-
Contractor
- DPP Ltd
- CF Roberts
- FME FM
- FSE
- Selwyn Group
- WS Wright Ltd
-
Contractor Ref:
-
Mitchell's & Butlers Order Number
-
House:
-
BUN Number:
-
Brand:
- All Bar One
- Browns
- Castle
- Crown Carvery
- Ember
- Harvester
- Miller & Carter
- Nicholsons
- Oaktree
- O'Neills
- PCDG
- Sizzling
- Toby Carvery
- Tokyo
- Tuk Cho
- VPK
- Vintage Inn
-
Date & Time of Call:
-
Call Placed By:
-
Problem:
-
Response Requested:
-
Repair Type:
-
List Nature of Call:
-
Arrival on Site:
-
Full Job Description:
Health & Safety Requirements - before work commences, have you and the Duty Manager discussed;
-
The Requirements of The Work:
-
Relevant Health & Safety Precautions and
-
Inspected The House Asbestos Register:
-
Job Risk Rating (refer to guidance)
FILLED IN BY CONTRACTOR AFTER WORK IS COMPLETED
-
Works Completed:
-
Hours on Site:
-
Full Repair:
-
Temporary Repair
-
AOV: (OR call out charge for no works or abortive call)
-
Fixed Price: (for ARS or PPM works)
-
Fault Code:
- A - Operator Error
- B - Poor House Keeping
- C - Vandalism
- D - Poor Design/Installation
- E - General Wear & Tear
- F - Equipment Life Expired
- G - Aborted Visit
- H - Recall
- J - Site Staff Damage
- L - Lamp Replacement
Time & Materials:
-
No of Operatives
-
Hours on Site:
-
Rate Per Hour:
-
Materials Used:
-
Plant Used:
-
Box A:
-
Asset Number:
-
Make & Model of Equipment:
-
Engineer Signed:
COMPLETED BY THE PERSON IN CONTROL OF THE PREMISES
-
THE ABOVE WORKS HAVE BEEN COMPLETED TO MY SATISFACTION I hereby request MAB to pay (contractors name)
- DPP Ltd
- CF Roberts
- FME FM
- FSE
- Selwyn Group
- WS Wright Ltd
-
The Sum Of £ (as box "A" above)
-
Print Name;
-
Position Held:
-
Reason if Declined To Sign:
-
How Do You Rate The Quality & Service: