Title Page
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Checked by
-
Location
-
Personnel
On arrival
-
Were we on time?
-
Time in
-
Equipment arrived on time/without damage
-
Risk assessment carried out
-
All personnel have signed in, Steel caps and hi-vis worn at all times
-
Old boards are correctly taken down
Screen installation
-
Attached photo of screen installation
-
Screens are level/flush
-
Screens have adequate fixings x 12 fixing points. Minimum screw depth 50mm
-
Screens have network connectivity? Check using LG remote in Settings
Cable installation
-
Attached photo of cable installation
-
Cables have plenty of slack
-
Cables are correctly labeled
Final check
-
Site is left tidy/as it was found
-
All screens are powered and receiving signal
-
Cables/fixings are not visible
-
All rubbish has been disposed of
-
Time out
-
Add signature