Information
-
Audit Title
-
Client
-
Conducted on
-
Prepared by
-
Accompanied by
-
Location
-
Personnel
-
Company Division
- Demolition
- Infrastructure
- Haulage
- Mardyke
- ABW
-
This report is to be used by the Assessor to inspect the site and record any environmental hazards and any H&S issues identified. The Assessor should also pick an area of further inspection (e.g. Emergency arrangements etc) to ensure these are compliant with regulations and in- house procedures
-
Overview of current works
-
Have items from previous inspections been closed out?
Hazard spotting
-
Hazard
-
Close out time scale
-
Closed out by (sign and date)
-
Hazard definition
- 1st aid
- displayed information
- project paperwork
- site welfare
- COSHH
- fire precautions
- safety signage
- work @ height
- excavations
- plant & machinery
- lifting equipment
- crane
- edge protection
- temp works
- hot works
- isolations
- portable tools
- hoist
- MEWPS
- hoarding and fencing
- traffic routes
- access and egress
- PPE
- housekeeping
- environmental
- health hazards
- public interface
- site security
-
Root Causality
- Design
- Error enforcing conditions
- Tools and Equipment
- Housekeeping
- Maintenance Management
- Procedures
- Training
- Communication
- Incompatibility of goals
- Organisation
- Defences
- Sub-contractor
Environmental and Sustainability
-
Are COSHH items being stored correctly?
-
Are waste and chemicals stored away from drains / drains protected?
-
Has the EMP been updated (from tender copy / to reflect site progress)?
-
Has the SWMP been updated (within the last 3 months)?
-
Have both documents been briefed out to key members of staff (supervisor and above)?
-
Has the project carried out spill training?
-
Is there good planning with regards spill protection?
-
Are waste tickets being completed correctly?<br>(Please provide examples)<br>
-
Is Environental monitoring being completed?
-
Is there any evidence of materials / liquids being deposited outside of site boundary? (e.g. Mud on road etc)<br>
Positive observations
-
Positive observation
-
Procedural Compliance
-
Record area of inspection
Non - Compliance
-
Non - compliance noted
-
Causality
- Information Incomplete
- Information not updated
- Not briefed out
- SSOW not followed
- SSOW not understood
- Procedure not followed
- Procedure not understood
- Procedure Inaccurate
-
Closed out (Sign and Date)
SHEQ Bulletins
-
SHEQ bulletins up to date and relevant
Inspection Sign off
-
Add signature