Title Page

  • Environmental Inspection ISO14001: 2014

  • Client / Site

  • Add location
  • Conducted on

  • Prepared by:

  • Site representative participating in inspection:

For current legislation that applies to this inspection, please refer to Erith Group's Legal Register. A copy can be provided on request.

  • Inspection Number: (project code followed by / followed by full date)

Site or Project details:

  • Who is the Client:
  • What type of project is this? (Select all that applies)

  • Project number (Record "NIL" if no project number exists)

Pre Inspection

  • Have you been given a site specific induction that relates to environmental risks?

  • Has there been a prior audit or inspection carried out on this project?

  • Have any actions or observations been closed out where applicable?

  • Have these changes, where applicable, been maintained?

Permits and Authorisations

  • Are sections 60/61/80 F10 authorisations on file / on display?

  • Does the site require a crusher permit?

  • Does the project have disposal site permits for all disposal sites it uses?

  • Photos

  • Notes:

Project Management

  • Does the project look clean and well organised?

  • Is all surface accumulation of water being managed?

  • Are spill kits kept near drains?

  • Are spill kits dry, unused and complete?

  • Is there evidence of staff undertaking emergency drill training (fire, spillage, etc.)?

  • Is there a requirement for Client based training for project staff?

  • Is the projects environmental aspects on display and trained out?

  • Have all staff been briefed on the Environmental Management Plan for the project?

  • Have all services been identified and planned on a project plan?

  • Is there evidence of both Contractors signing up to our RAMS and vice versa?

  • Are all items of unused plant and machine switched off when not in use?

  • Are hoses and pipes checked?

  • Are utility meter readings kept (gas, electricity, water, diesel, plant oil)

  • Photos

  • Notes

Security

  • Is the project fully hoarded / fenced?

  • Can the project be "locked down" in an emergency?

  • Is there CCTV or manned overnight security on the project?

  • Photos

  • Notes

Project Emissions

  • Is there a system in place to control dust both on and off of project?

  • Is there evidence that nothing is escaping the boundary?

  • Is there a system in place to stop mud leaving the project?

  • Is there a system to ensure no loads are taken from site in-sheeted?

  • Is monitoring in place for noise, dust and vibration?

  • Photos

  • Notes

Hazardous and Non-hazardous Waste and Materials Management

  • Is there evidence of recycling on the project?

  • Is waste and material segregated by type?

  • Is all waste and material stored securely?

  • Do sample transfer notes meet compliance?<br>(Take photographic evidence)

  • Are rejected loads from the project (where applicable) being recorded and reported correctly?

  • Notes:

  • Is COSHH data available?

  • Notes

  • Is there a spill kit close to these areas?

  • Are there fire extinguishers close to these areas.

  • Have drains that are close to these areas been protected?

  • Notes

  • Is a waste log being kept updated on Ezone?

  • Is there evidence of a Waste Management Plan available for the project?

  • If so, has it been trained out or shared with the Client / Contractor?

  • Is there a Materials Management Plan required for the project?

Adjacent to the project

  • Has the project identified a adjacent river, pond, lake or other watercourse to the project?

  • Does the project have approval for discharging to the foul sewer?

  • Has a permit been issued by the local water company?

  • What is adjacent to the project?

  • North

  • East

  • South

  • West

  • Has the project engaged with neighbours and local residents?

  • Notes:

  • Have any concerns or complaints (if any) been resolved and recorded?

  • Notes:

Oils / chemicals / COSHH Storage

  • Are all oils stored correctly?

  • Photos

  • Notes

  • Are all chemicals stored correctly?

  • Photos

  • Notes

  • Are all COSHH items stored correctly in a locked area?

  • Photos

  • Notes

Ecology

  • Has an ecological survey either been carried out or provided by the Client or PC?

  • Have any wildlife identifications been investigated?

  • Have any intrusive species been identified on or near the project?

  • Is there a public right of way on the project?

  • Photos

  • Notes

Alerts

  • Is the latest environmental alert on display?

  • Photo

  • Many thanks for your hospitality and time on project today. Your inspection will be forwarded to you in due course. Where actions or observations have been made, please keep the team up-to-date with your progress. If you need any support in the above, please let the E&S Team know. leigh.phillips@erith.com Lauren.fielder@erith.com 0870-9508800

  • Inspector

  • Project representative

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.