Information
-
Project # and Project Name
-
Audit Month & Year
-
Location
-
Prepared by
-
For the Client/Project Manager:
-
Conducted on
-
Contractor and Contract #
Environmental System
-
Is the Environmental Policy Displayed?
-
Are the Environmental Inspection Records onsite?
-
Are the Tool box, pre-start & project meeting records onsite?
Housekeeping and Material Storage
-
Is the stockpile location appropriate? <br>(ie. not on vegetation, within driplines or drainage lines)
-
Are you satisfied there are no impacts on vegetation?
-
Are you satisfied there are no impacts to fauna?
Mobile Plant and Equipment
-
Are Plant and Equipment clean prior to starting onsite?<br>(ie. free of weeds, soil and vegetation)
-
Are major Plant and Equipment serviced/maintained?<br>(ie. no oil leaks, excessive exhaust emissions or excessive exhaust noise)
Hazardous Substances
-
Are spill kits and spill containment equipment onsite?
-
<br>Are fuels and chemicals stored in bund, container, spill trays?
Excavation and Trenching
-
Is spoil/topsoil appropriately stockpiled?
-
Is contaminated soil separated and disposed to licensed facility?
-
Have Aboriginal Heritage items been identified?
-
Has fauna identified in trenches been removed by NPWS/RSPCA?
-
Has imported fill been confirmed as weed free?
Asbestos Work
-
Has Asbestos waste been disposed to a licensed facility?
Water
-
Are you satisfied that there is no evidence of discharges to watercourses?
-
Are there satisfactory sediment and erosion controls in place?
-
Are there satisfactory controls in place for working over/adjacent to water?
Amenities
-
Are there satisfactory waste separation/recycling bins in place?
Other
-
Is the site Compliant with other requirements not already specified?<br>(see site specific EMP)
I confirm the contractor's implementation and maintenance of project specific controls has been inspected against "EMS-APPR-B Standard Preliminary Environmental Management Plan (Construction) - Minor Works". Where non-compliance has been identified corrective action will be, or has been taken.
-
Contractor Signature
-
Project Manager Signature
-
Select date