Title Page

  • Project Name and Number

  • Conducted on

  • Subcontractor or type of work being carried out

  • Person conducting audit

Actions where Applicable

HERITAGE ITEMS

  • Identify & protect any heritage items on site

SOIL & WATER MANAGEMENT

  • Set up a system to prevent run off into creeks, streams and rivers

  • Block off all storm water drainage points likely to be affected with barriers, silt curtains or similar methods of containment to prevent pollutants from entering the stormwater drainage system

  • Remove contaminated water and material using pumps, environmental tankers or other suitable means

  • Minimise water for cleaning

  • Sweep contaminated roads daily

  • Are dirt roads and construction areas watered to minimize dust?

  • Are speed control measures implemented (e.g., signage, tailboard)?

WORKING AROUND EXISTING TREES, SHRUBS & NATIVE GRASSLANDS

  • Minimise clearing of vegetation

  • Check with council and/or a tree surgeon on individual requirements

  • Follow the tree surgeon's advice on rectification work to be followed if accidental damage is caused

  • Report any damage to the authorities

  • Fence off protected areas to minimize disturbance

  • Where practicable, revegetate any areas affected with native grasslands

WEED CONTROL

  • Check with authorities and have noxious wees removed if allowable

WASTE / HAZARD MANAGEMENT

  • Separate recyclable waste from non-recyclable waste

  • Provide refuse containers on site

  • Recycle waste material such as concrete for road base. Check with authorities on their requirements

CONTAMINATED CONSTRUCTION SITES

  • Removing existing contaminated soil or contaminants in the soil on construction sites is specialised work and expert advice must be sought before commencing work

UNCOVERING BURIED or DISCARDED ASBESTOS WASTE

  • Where any buried or dumped asbestos, or suspected asbetos, is uncovered or found during excavation works then work is to cease immediately

  • A 10 metre no-go-zone is to be set up around the suspected contaminated area

  • Asbestos signage is to be posted

  • Advise WorkSafe

  • Engage an approved asbestos removalist to remove the asbestos

MATERIAL STORAGE

  • Stockpile materials in non run off areas

  • Do not over order materials

  • Store all materials & bins on site

  • Have the bins and skips emptied or removed at appropriate times to ensure they do not overflow

VEHICLES

  • Limit entry & exit points for vehicles

  • Do not work or park on nature strips

  • Provide tyre washing facilities where required

HANDLING OIL AND SIMILAR SPILLS

  • Provide a contamination spill kit to remove contaminated material

CHEMICAL & HAZARDOUS WASTE

  • Are chemical & hazardous wastes properly stored and labelled?

  • Do not burn off waste products or off cuts

NOISE EMISSIONS

  • Limit hours of operation to suit council requirements

  • Do not use loud radios on site

  • Noise levels must be kept to a minimum

  • Use noise suppressors on machinery

  • Where required under the Occupational Health & Safety Regulations 2017 noise assessments are to be carried out on plant and equipment in the work place

PUBLIC

  • Notify Neighbours of work in advance

  • Ensure safe access past the site is provided

DUST EMISSIONS

  • Damp down stockpiles to reduce dust

  • Dust levels must be kept to a minimum

  • Use water trucks with sprays (if permitted) to lay down dust

  • Wet cut bricks & pavers

CONCRETING

  • Wash out trucks at suppliers depot

  • Wash out where it will not contaminate drains roads etc

  • Return excess concrete to the supplier or store in bin for recycling

LANDSCAPING

  • Reinstate ground works as soon as possible

  • Complete landscaping & re-vegetation as soon as possible

  • Choose appropriate trees & bushes for the site

BRICKLAYING & PAVING

  • Wet cut to prevent dust

  • Collect water to prevent it from contaminating drains roads etc..

  • Store excess mortar for recycling

FOLLOW-UP TO ACTION ITEMS

PAINTING

  • Wash out brushes/rollers in a drum

  • Seal areas to be sanded to prevent dust

  • Dispose of empty cans safely

TRENCHING & OTHER EXCAVATIONS

  • Establish sediment control measures

  • Fill in trenches to minimize erosions

  • Do not stockpile near spoon drains

  • OTHER:

  • Signature

  • Position

  • Date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.