Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
-
Region
-
Contractor/s
-
Depot
-
Audit Date
-
Time
1. Environmental Management
-
Is a valid environmental policy displayed on site?
-
Is a valid environmental management plan (EMP) available on site?
-
Is the EMP sufficiently detailed to cover site specific issues?
-
Have appropriate environmental risk controls been identified and are they in place on site?
-
Are the potential environmental risks and issues understood by the Site Manager
-
Have all site staff received industry standard environmental induction training?
-
Are environmental toolbox talks (TBT) held regularly (i.e. monthly basis)
-
Is there a process in place for staff to suggest improvements
-
Is the incident reporting procedure visible to staff?
-
Are staff aware of how to report an environmental incident/near miss?
-
Is there evidence the incidents/near misses are being reported?
2. Waste Management
-
Is there an opportunity for waste to be segregated on site?
-
If so, is it segregated correctly?
-
Is waste in suitable containers (sealed, covered, bunded)?
-
Is the waste area well maintained and tidy?
-
Are records available for the classification, transfers and disposal of waste?
3. Land and Site Management
-
Is there a copy of the SPs own Environmental Risk Assessment available on site?
-
Are all potential pollutants (i.e. chemicals and oils) stored and labelled correctly?
-
Does plant (including mobile plant) have adequate drip tray coverage?
-
Is there a specific area for the refuelling of plant and machinery?
-
Does the ground or surrounding area appear to be stained or show patches of discolouration?
-
If known contamination is present on site, are control measures in place?
-
If contamination is not present on site, how has this been determined?
-
Has excavated spoil been subject to the required testing (as per MNG-CG-0018 Waste Management)
-
Are stockpiles positioned out of the drip line of trees?
-
When relevant, have areas of reinstatement been managed appropriately?
4. Water
-
Is there a site drainage plan available on site?
-
Is run-off managed to avoid groundwater and/or stormwater contamination?
-
If applicable, are adequate measures taken to prevent silty construction run-off escaping site?
-
Are spoil heaps located sufficient distance from a watercourse (i.e. >10m where possible)
5. Community relations/neighbours
-
If applicable, have locals been informed of the proposed works?
-
Have there been any complaints and have they been actioned accordingly?
-
Is noisy plant and machinery left idle while not is use?
-
Are dust generating activities (i.e. concrete cutting), being managed correctly i.e. water hoses attached to cutting equipment?
-
Are spoil heaps covered or dampened down to avoid dust generation?
-
Is there a site speed limit in place?
-
If applicable, is on site lighting downward or task facing?
-
Comments