Opportunity for Improvements, Incidents & Complaints

  • Have there been any recent noise, odour or other complaints?

  • If so, were these documented? How and by whom?

  • undefined

  • Have there been any incidents since the last audit (or within 6 months)?

  • If so, have any actions from this incident been implemented?

  • undefined

  • Is the operator aware of how to report incidents or opportunities for improvements?

  • undefined

  • Have there been any incidents that were reported to the EPA or other regulatory authorities?

  • undefined

Documents and Records Management

  • Are the following documents available on site and being filled out accordingly?

  • Wastewater routine monitoring schedule

  • undefined

  • Environmental Improvement Plan

  • undefined

  • All Hazards Incident Management Plan

  • undefined

  • AIIMS Emergency Response Handbook

  • undefined

  • Fire Awareness & Preparedness Handbook

  • undefined

  • Instrument calibration procedure

  • undefined

  • Meter Readings Log Sheet

  • undefined

  • Pipeline shutdown procedure

  • undefined

  • Pump Station pH and Turbidity Log Sheet

  • undefined

  • Pump Station Site Works Log Sheet

  • undefined

  • Screen Cleaning Procedure

  • undefined

  • Vehicle Log Sheet

  • undefined

  • Operation & Maintenance Manual

  • undefined

  • Are there any other records or documents used to manage or monitor operations of the asset? If so, please list.

  • undefined

  • Has all plant and equipment been maintained in accordance with the Preventative Maintenance Schedule and manufacturers recommendations?

  • undefined

  • Are there any works required that may require environmental permits?

  • undefined

  • If so, are you aware of the process to obtain the relevant approvals?

  • Has all equipment been calibrated within the specified timeframe (i.e. by the due date) or within the six months?

  • undefined

  • Have water quality samples been taken in accordance with the Routine Monitoring Schedule?

  • undefined

Visual Site Inspection

  • Are there higher than normal noise levels on-site (i.e. can anything be heard outside the premises boundary)? If yes, what has been done to resolve this?

  • undefined

  • Can you detect any odour on site?<br>

  • undefined

  • Can you detect any odour beyond the site boundary?

  • undefined

  • Are there any visible dust plumes, smoke or other visible emissions (other than water vapour) on site?

  • undefined

  • Are spill kits available on site and placed logically near bunds/ other areas where spills may occur?

  • undefined

  • Are all chemical filling points bunded?

  • undefined

  • Is there evidence of chemical or other spills around the site?

  • undefined

  • Are there any leaking valves, plant or other equipment on site?

  • undefined

  • Has there been any discharge of wastewater off site in the last year? If so, what were the circumstances?

  • undefined

  • Are recycling and waste options available at the site?

  • If so, are they being appropriately used?

  • undefined

  • Is there evidence of erosion on site, i.e. at waterway crossings, culverts, coverage of the pipeline?

  • undefined

  • Is there any native vegetation or culturally significant sites that have been recently disturbed or impacted?

  • If so, were the necessary permits and requirements adhered to and has the Environment Team been involved in this process?

  • undefined

  • Are storage areas secure to prevent unauthorised access or vandalism?

  • undefined

  • Have there been any security issues in the past?

  • undefined

  • Are there any noxious weeds within the site area (e.g. Blackberries, Scotch Thistle, Ragwort)?

  • undefined

Monitoring, Extraction and Discharge Points

  • Is the extraction point or discharge point clearly labelled?

  • undefined

  • Are all sampling points for water, soil or air monitoring clearly marked and accessible?

  • undefined

  • Are there other areas on site that have not been visited?

  • If yes above, why?

  • undefined

Contractor Management

  • Are contractors used to perform any works on this site?

  • If yes, have all contractors completed the Gippsland Water corporate and site inductions?

  • Have all environmental and safety risk assessments been completed for all current contractor works?

  • Are controls in place to manage any identified environmental risks (if applicable)? e.g. sediment control, spill kits etc.

Comments / Other

  • Add media

  • undefined

Sign off

  • Add signature

  • Select date

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.