Title Page
-
Document No.
-
Project name
-
Client
-
Conducted on
-
Prepared by
-
Location
-
NC Reference
General
-
Awarded contract document signed
-
Contractors insurance in the file
-
Project safety file completed
-
Copy of order available on site
-
Department of labour page in contract document signed and submitted to DOL by Contractor
-
Project co-ordinates (GPS) recorded?
-
UIF contribution being made
-
Proof of issue of PPE in the file?
-
Proof of payment of beneficiaries available?
-
Proof of payment (EFT). (Proof of banking details required)
-
Wage slips issued
Data Management
Data capture records
-
Are contractor IDs collected?
-
Participant's Identity Documents attached to contracts
-
Are IDs certified within 3 months of appointment?
-
ID pictures are recognisable?
-
Have the IDs been checked against the ERS deceased and rejected list?
-
No beneficiaries appear on the deceased/rejected list?
-
Specify details and proposed remedial action if required
-
EPWP Participant's Contracts signed and in the file
-
Is the contract an EPWP contract?
-
Does the contract state that it is an EPWP contract?
-
Does the contract reference the Ministerial Determination for the Expanded Public Works Program?
-
Does the contract stipulate the scope of the work/tasks?
-
Does the contract stipulate a fixed start and finish date?
-
Are names and ID Numbers on the contracts exactly as that indicated on the ID documents?
-
Daily site register up to date?
-
Participant list clearly indicating current and exited participants up to date?
Data Capture Tool (DCT) for the EPWP Reporting System
-
EPWP Project Registration form and Business plan correctly completed?
-
Participant list is up to date?
-
Any training performed is recorded?
-
Monthly progress including wage data reported separately for every month since the project commencement? (Current financial year)
-
Missing months
-
April
-
May
-
June
-
August
-
July
-
September
-
October
-
November
-
December
-
January
-
February
-
March
-
Has the DCT been submitted to the Data Capturers?
-
Has the DCT data been captured on the ERS?
-
Select the Data which is up-to-date
-
Work opportunities
-
Person days of work
-
Training days
-
Financial information
-
Specify details of info which does not correspond
Other reporting checked
-
A6
-
Does the Data correspond with the Data capture tool
-
Project list
-
Does the Data correspond with the Data capture tool
-
SDR
-
Does the Data correspond with the Data capture tool
-
Information checked and signed by project manager?
Branding and legislative
Legislative Compliance
-
Valid Letter of Good Standing available covering EPWP beneficiaries?
-
Beneficiary Supervisory Team understand injury response including managing the injury treatment process as well as completing the necessary forms.
-
Minimum daily wage rate (R)
-
The minimum rate as per the Ministerial Determination is R78.86 for the 2015/16 financial year up to the 31 October 2016. The wage rate must be adjusted.
-
Maximum daily wage rate (R)
-
Whilst the Ministerial Determination does specify a maximum wage rate, the reporting dystem does allow a wage rate above R300.
Branding
-
Items on site
-
Signboard
-
EPWP branded
-
Overalls
-
EPWP branded
-
Safety vests
-
EPWP branded
-
Hardhats/Other head gear
-
EPWP branded
Training
Summary of training
-
Total person days of training
-
Unaccredited training person days (inductions, toolbox talks, dsti etc)
-
Unaccredited courses training person days
-
Accredited courses training person days
-
Learnerships training person days
-
Total training person days
Training planning
-
Combined training budget specified in the bill (Rands)
-
Training plan developed
-
Does the training plan allow for the total spend of the training budget by the end of the project?
-
Is the training plan on schedule?
-
Type of training
-
NQF Qualification
-
Name of qualification
-
NQF Level
-
Number of learners
-
Accredited courses
-
Name of course
-
Unit standards
-
Number of learners
-
Other courses
Add course info
-
Name of course
-
Number of learners
Training progress
-
Amount spent to date (Rands)
Course info
-
Name of course
-
Course SAQA Accredited
-
Number of learners
-
On the job training undertake
Training details
-
Details of training
-
Have records of training been kept?
-
Training may be reported provided that adequate records are maintained.
-
Number of learners
LIC
LIC Compliance
-
Activities have been identified in the bill as LI
-
LI activities currently being undertaken
-
Clearing and grubbing
-
Team size (number)
-
Average production rate (m^2/day)
-
Other comments/recommendations
-
Excavation
-
Team size (number)
-
Average production rate (m^3/day)
-
Other comments/recommendations
-
Gabions
-
Team size (number)
-
Average production rate (m^3/day)
-
Other comments/recommendations
-
Guardrails
-
Team size (number)
-
Average production rate (m)
-
Other comments/recommendations
-
Kerb and channel
-
Team size (number)
-
Average production rate (m)
-
Other comments/recommendations
-
Sidewalks
-
Team size (number)
-
Average production rate (m)
-
Other comments/recommendations
-
Traffic accommodation
-
Team size (number)
-
Other comments/recommendations
-
VDrains
-
Team size (number)
-
Average production rate (m)
-
Other comments/recommendations
-
Other
Specify details
-
Details
-
Unit of measure
-
Team size (number)
-
Production rate
-
Are items which are specified as LI being constructed labour intensively?
-
LI activities identified which could be undertaken using LI
Type of work undertaken
-
Daily wage
-
Piece work
-
Task based work
Sign off
Site representive
-
Site representative
-
Job Title
-
Representing company
Auditor details
-
Auditor details
-
Representing company
-
Job Title