Title Page

  • Audit title

  • Client

  • Contractor

  • Audited by

  • Document No.

  • Conducted on

  • Location
  • NC Reference

General

Basic project information

  • Audit project fundamentals?

  • Project location (site camp)
  • Funding body

  • Implementing body

  • Sphere of government

  • Responsible Business Unit

Project details

  • Audit Project Details

  • Project Description

  • Sector

  • Type of contract

  • ERS Profile ID

  • Project start date (Actual)

  • Expected finish date

  • Source of funding

  • Equitable Share

  • Budget (R)

  • PRMG

  • Budget (R)

  • Other

  • Name of fund

  • Budget (R)

Previous audit review

  • Was there a previous audit undertaken?

  • Findings discussed?

  • All previous action items closed?

EPWP File: General information

  • Audit EPWP File: General Info?

  • Awarded contract document signed

  • Copy of order available on site

  • Department of labour page in contract document signed and submitted to DOL by Contractor

  • Valid Contractor's Liability Insurance in the file

  • Updated audited safety file available on site

  • Date of last safety audit

  • Key findings on site resolved

  • UIF contribution being made

  • UIF number

  • Copy of EMP 201 inserted in the file

  • Proof of payment of beneficiaries available?

  • Proof of payment (EFT). (Proof of banking details required)

  • Minimum daily wage rate (R)

  • The minimum rate as per the Ministerial Determination is R83.59 for the 2017/18 financial year up to the 31 October 2016. The wage rate must be adjusted.

  • Maximum daily wage rate (R)

  • Whilst the Ministerial Determination does specify a maximum wage rate, the reporting dystem does allow a wage rate above R350.

  • Proof of issue of PPE in the file?

  • Valid Letter of Goodstanding available?

  • Date of expiry?

  • Beneficiary supervisory team understand injury response process including managing the injury treatment process as well as completing the neccessary form

  • Key supervisory staff understand the Ministerial Determination for EPWP

Data Management

Participant Management

  • Is a participant list available showing all participants for the financial year?

  • Does the participant list contain all fields as per the departmental template?

  • Participant list is up to date?

  • Are participants numbered (in order of recruitment)

  • Daily site register up to date?

ID Document Management

  • Are participant IDs collected?

  • Participant's Identity Documents filed by participant number

  • Sampled IDS

  • Cumulative number of participants

  • Sample size

  • Are IDs certified within 3 months of appointment?

  • ID pictures are recognisable?

  • Have the IDs been checked against the ERS deceased and rejected list?

Participant contract management

  • Are participant contracts in place?

  • Type of participant contract used?

  • Is the template being used?

  • Is the contract completed correctly?

  • Are the contracts filed in order of their participant number?

  • Number of contracts sampled

  • Does the contract reference the Ministerial Determination for the Expanded Public Works Program?

  • Does the contract stipulate the scope of the work/tasks?

  • Does the contract state that it is an EPWP contract?

  • Does the participant contract state a finish date no later than the end of the financial year?

  • Are names and ID Numbers on the contracts exactly as that indicated on the ID documents?

  • Participant's Contracts signed by employer and employee

  • Contracts filed by participant number?

Data Capture Tool (DCT) for the EPWP Reporting System

  • EPWP Project Registration form and Business plan correctly completed?

  • Month which data is being compared

Work opportunities (Cumulative)

  • Site Participant List

  • DcT

  • ERS

  • A6

  • SDR

  • Do all reports correlate?

Person days (Cumulative)

  • Attendance registers

  • DcT

  • ERS

  • A6

  • SDR

  • Do all reports correlate?

Training (Cumulative)

  • Site training days

  • DcT

  • ERS

  • A6

  • SDR

  • Do all reports correlate?

Project spend

  • Site records

  • DcT

  • ERS

  • A6

  • Do all reports correlate?

Outputs (Cumulative)

  • Type of primary output

  • Unit of measure

  • Site record output

  • DcT output

  • ERS output

  • A6 output

  • SDR output (cumulative)

  • Do all reports correlate?

ERS Feedback

  • No participants appear on the deceased/rejected list?

Branding and legislative

Branding

  • List of Potential Branded items, used on site

  • Is the signboard branded correctly?

  • Are overalls branded correctly?

  • Are T-shirts branded correctly?

  • Are hardhats branded correctly?

  • Are Wide Brim hats branded correctly?

  • Are vests branded corrctly?

  • Are participants from the local community wearing correctly branded PPE?

  • Name/s of participants sampled

Training

Summary of training

  • Combined training budget (R)

  • Actual training spend to date (R)

  • Has a project Training Plan been developed

  • Audit training plan

  • Does the training plan contain the following:

  • List of courses to be undertaken

  • Number of learners

  • Programme for training considering the project duration

  • Time based training cash flows which are achievable considering the project duration.

  • Is the training plan on schedule?

Training progress

  • Total cumulative person days of training

  • Unaccredited training person days (inductions, toolbox talks, dsti etc)

  • Unaccredited courses training person days

  • Accredited courses training person days

  • Learnerships training person days

  • Total training person days

  • Training days in the last month

  • Cumulative training days from project commencement

  • Cumulative training days in financial year

  • Type of training in the last month

  • NQF Qualification

  • Name of qualification

  • NQF Level

  • Number of learners

  • Accredited courses

  • Details of courses

  • Course
  • Name of course

  • Unit standards

  • Number of learners

  • Other courses

  • Add course info

  • Course
  • Name of course

  • Number of learners

  • On the job training undertake

  • Training details

  • On the Job Training
  • Details of training

  • Have records of training been kept?

  • Training may be reported provided that adequate records are maintained.

  • Number of learners

LIC

LIC Compliance

  • Activities have been identified in the bill as LI

  • Are any of the activies on the circular list being undertaken?

  • Clearing and grubbing

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m^2/day)

  • Other comments/recommendations

  • Excavation

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m^3/day)

  • Other comments/recommendations

  • Gabions

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m^3/day)

  • Other comments/recommendations

  • Guardrails

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m)

  • Other comments/recommendations

  • Kerb and channel

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m)

  • Other comments/recommendations

  • Sidewalks

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m)

  • Other comments/recommendations

  • Traffic accommodation

  • Team size (number)

  • Other comments/recommendations

  • VDrains

  • Is the activity being undertaken labour intensively?

  • Is the activity being undertaken labour intensively?

  • Team size (number)

  • Average production rate (m)

  • Other comments/recommendations

  • Other

  • Specify details

  • Other LI work
  • Is the activity being undertaken labour intensively?

  • Details

  • Unit of measure

  • Team size (number)

  • Production rate

  • Are items which are specified as LI being constructed labour intensively?

  • LI activities identified which could be undertaken using LI

  • Type of work undertaken

Sign off

Site representives

  • People present during audit

  • Person
  • Representative Type

  • Job title

  • Name of representative

  • Job title

  • Name of representative

  • Job title

  • Name of representative

Auditor details

  • Name of auditor

  • Devan Govender, Naidu Consulting, PR ENG, Project Manager

  • Signature

  • AnnaPortia, Naidu Consulting, NDip, EPWP Coordinator

  • Signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.