General
-
Is traffic control effective from a drive through?<br>
-
Are signs easy to read and spaced effectively for the road user?
-
Are speed restrictions in force?
-
Are speed restriction generally being adhered to?
-
Was the wait time reasonable?
-
Was an alternate route used to bypass work area?
-
Is the road surface travelled through, around or past the work site satisfactory?
-
Did traffic controllers seem courteous and helpful to road users?
-
General comments.
TCP
-
Refer: Traffic Control at Worksites manual - section 4
-
Has a standard TCP been selected?
-
Did the TCP require modification?<br>RMS red ticket needed.
-
Was a new TCP drawn?<br>RMS orange ticket needed.
-
Is the approved TCP on site and signed?<br>TCWS 4.3.4
-
Is the location risk assessment attached?<br>WHS procedure 6.10 section 12.1
-
Is the TCP relevant to the work being conducted?<br>TCWS 4.4.2
-
Are all signs and devices in place as per the TCP?<br>TCWS 4.4.2
-
Add comments regarding the TCP.
Roadwork Speedlimits
-
Refer: Traffic Control at Worksites Manual - section 8
-
Is a worksite speed reduction in place?<br>TCWS 8.2
-
Are speed limit signs correctly spaced?<br>TCWS 8.2.4
-
Are conflicting speed limit signs and pavement markings covered or removed?<br>TCWS 8.2.5a & e
-
Has the speed limit been notified to relevant authorities?<br>WHS procedure 6.10 section 10.2.
-
Is a road occupancy license (ROL) required and on site?<br>
-
Is the speed limit noted on the TCP?<br>TCWS 8.2
-
Add comment regarding speed limits.
Signs and Devices
-
Refer: Traffic Control at Worksites Manual - sections 3, 5, 9.
-
Are signs current and in good condition?<br>TCWS 3.1.1
-
Are signs the correct size?<br>TCWS 3.2.2
-
Are signs erected at the correct height and position?<br>TCWS 3.2.7 & 3.2.8
-
Verify daily traffic control sign inspection have taken place and documented?<br>WHS procedure 6.10 appendix B.
-
Are barrier boards being used effectively?
-
Are cones and bollards installed at correct spacings?<br>TCWS 5.2.2
-
Have the needs for pedestrians been provided for?<br>TCWS 9.3
-
Have cyclists needs been considered?<br>TCWS 9.4
-
Have residents entry and exit been considered and controlled?<br>TCWS 9.7
-
Have signs and devices been checked for night visibility?<br>TCWS 9.2.8
-
Has the potential for end of queue accidents been considered?<br>TCWS 3.5.7
Portable Traffic Signals
-
Refer: TCWS section 10
-
Is the approach speed 80km or less?<br>TCWS 10.7.2
-
Is the minimum sight distance provided?<br>TCWS 10.7.3
-
Is the signal timing setup effective for traffic flow?<br>TCWS 10.11.2
Flashing Arrow Sign / Variable Message Board
-
TCWS section 11
-
Is it the correct type and approved for use?<br>TCWS 3.2.11 & 11.2
-
It is located in a safe position?<br>TCWS 11.4.4
-
Is the message relevant and readable?<br>TCWS 3.2.9
-
Add comments regarding signs and devices.
Traffic Controllers
-
Refer: Traffic Control at Worksites Manual - section 8.1
-
Traffic controllers have been trained and are carrying the RMS blue ticket?
-
Has an escape route been clearly defined?
-
Are controllers wearing the appropriate high visible uniform with authorized traffic controller notation?
-
Are controllers positioned to be visible for approaching traffic?<br>TCWS 8.1.1d & f
-
Is there sufficient communications between controllers?<br>TCWS 8.1.1g
-
Are rest breaks setup for controllers?<br>TCWS 8.1.1h
-
Add comments regarding traffic controllers.
Other worksite Hazards or Comments:
Recommendations:
-
Enter comments or recommendations;
-
Signature of auditor:
-