Information
-
Site
-
Unique site sort code
-
Client
-
Reason for survey
-
Conducted on
-
Prepared by
-
Essex Group Document No.
-
Was client (and/or Representative) in attendance during the survey?
-
Work Site
-
What is the revision of the ARM document at the time of the survey?
Mains Distribution
-
Location/reference
-
Distribution Board
-
Earthing arrangement
-
Circuit Chart
-
Cabling & containment
-
Installation to current standards/Regulation
TCR Requirements - this requires an independent supply from a spare way in a distribution board. Containment to be checked and route confirmed.
undefined
-
TCR location for dado drop
-
Route back to Distribution board
-
Distribution Board circuit way to be used.
-
Cabling & containment
ATM existing Power and data
-
Existing small power details - (number of outlets, cabling, age of existing)
-
Data outlet details
-
Existing containment details, (height, type, manufacture)
-
Existing installation to current standards/regulations
Any other installation details (lighting for signage, Security Location, tablets to be relocated)
-
Description
-
Photos
Strip out to existing services (noted in ARM Doc)
-
Details of strip out and existing services in place
Occupational Health and Safety
-
Are there any health and safety concerns?
Access/Egress
-
What access will be needed to complete the works? Ceiling height for route of any new services.
-
Logistics to project. Deliveries/loading & unloading. Parking.
-
Any special locations/permit requirements.
A.O.B Notes
-
A.O.B Information
-
Job Photos
-
Name
-
Title
-
Signature