Information
-
Sitet
-
Unique site sort code
-
Client
-
Reason for survey
-
Conducted on
-
Prepared by
-
Essex Group Document No.
-
Was client (and/or Representative) in attendance during the survey?
-
Work Site
-
Has the project ATM replacement pack (ARM1) been issued?
-
What status is the ARM1 pack at time of survey?
Mains Distribution
-
Location/reference
-
Distribution Board
-
Circuit Chart
-
Cabling & containment
-
Installation to current standards/Regulation
Small Power details
-
Socket outlets
-
Fused connection units
-
Isolator
-
Cabling & containment
-
Installation to current standards/Regulation<br>
Data Installation details -
Comms room location.
-
Any data outlets to be modified/newly installed.
-
If new, has route been confirmed and surveyed.
-
Data outlet numbers.
Any other installation details
-
Description
-
Photos
Occupational Health and Safety
-
Are there any health and safety concerns?
Access/Egress
-
What access will be needed to complete the works? Ceiling height.
-
Logistics to project. Deliveries/loading & unloading. Parking.
-
Any special locations/permit requirements.
-
Will OOH need to be considered?
A.O.B Notes
-
A.O.B Information
-
Job Photos
-
Name
-
Title
-
Signature