Title Page

  • Site conducted

  • Conducted on

  • Prepared by (Cilantro AP)

  • Location of DB (Block, Level, DB)

  • Name of DB

  • PHOTO EVIDENCE MUST BE TAKEN FOR EACH OF THE BELOW QUESTIONS

  • CABLE RUN COMPLETE

  • INDENTIFICATION OF CABLE

  • NUMBER OF LOCATIONS CABLE IS IDENTIFIED

  • DEAD TEST RESULT PRESENT (PHOTO OF DEAD TEST RESULTS)

  • SEPARATE EARTH PRESENT

  • CABLE TERMINATION COMPLETE

  • CONTINUITY OF CORES CHECKED

  • LUGS/ NUTS/ BOLTS ARE TORQUED TO MANUFACTURERS RECOMMENDATION. CONFIRM NO STRESS ON CABLES AND TERMINATIONS

  • CABLE READY FOR POWER

  • ALL EXPOSED AND EXTRANOUS CONDUCTIVE PARTS TESTED

  • COMMENTS

  • CILANTRO AP SIGNATURE

  • PRINCIPAL CONTRACTOR SIGNATURE

  • ANY OTHER PERSONS PRESENT

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.