Title Page
-
Site conducted
-
Conducted on
-
Prepared by (Cilantro AP)
-
Location of DB (Block, Level, DB)
-
Name of DB
-
PHOTO EVIDENCE MUST BE TAKEN FOR EACH OF THE BELOW QUESTIONS
-
CABLE RUN COMPLETE
-
INDENTIFICATION OF CABLE
-
NUMBER OF LOCATIONS CABLE IS IDENTIFIED
-
DEAD TEST RESULT PRESENT (PHOTO OF DEAD TEST RESULTS)
-
SEPARATE EARTH PRESENT
-
CABLE TERMINATION COMPLETE
-
CONTINUITY OF CORES CHECKED
-
LUGS/ NUTS/ BOLTS ARE TORQUED TO MANUFACTURERS RECOMMENDATION. CONFIRM NO STRESS ON CABLES AND TERMINATIONS
-
CABLE READY FOR POWER
-
ALL EXPOSED AND EXTRANOUS CONDUCTIVE PARTS TESTED
-
COMMENTS
-
CILANTRO AP SIGNATURE
-
PRINCIPAL CONTRACTOR SIGNATURE
-
ANY OTHER PERSONS PRESENT