Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Electrical Tester name
-
Location of works
-
Sanction For Test Permit Number
-
THIS RISK ASSESSMENT IS FOR ELECTRICAL LIVE TESTING WITH REGARDS TO REMOVING A BARRIER AND /OR ENCLOSURE
-
Hazards present
- Work at height
- Slips, Trips and Falls
- Manual Handling
- Working around other trades
- Mechanical systems
- Sharp objects
- Poor Lighting
-
PERSONS AT RISK
- Electrically Skilled Persons
- Young Person
- Pregnant Worker
- Other Contractors/ Visitors
- General Public
- Other (Please state below)
-
State "Other workers"
-
RISK CONTROL MEASURES (PPE is last resort)
- Flash proof overalls
- Flash proof gloves
- Insulated face shield
- GS 38 test leads
- Warning signage displayed
- No lone working (2 operatives in attendance)
- Demarcation to prevent unauthorised access to working area
- Other trades made aware of Live Testing
- Work at Height - Fibreglass step ladder EN166 (Step Permit Required) and signed off by PASMA trained person
- Slips, Trips and Falls - Work area to be cleaned on a "as you go" basis
- Poor Lighting - Battery task lighting to be used
- Sharp objects - Inspect work area prior to carrying out works. Kevlar sleeves and Cuit 3 gloves to be used where necessary
-
WORKER COMPETENCE
- JIB Electrician Gold Card
- C&G 2382 18th Edition
- C&G 2391 or equivalent test and inspection
- Other Please list below
-
"Other" Qualifications
-
RISK ASSESSMENT
-
FURTHER ACTION TO REDUCE RESIDUAL RISK AFTER CONTROLS
-
Electrical Tester signature
-
Cilantro AP Signature