Title Page
-
Site conducted
-
Conducted on
-
Prepared by
-
Location
Checklist
-
2:30 Hotel Pool Testing
-
3:00 Pm Spa Pool Tests Completed
-
Facility Maintenance Checklist
-
4:30 Hotel Pool tests Completed
-
5:00 pm Spa Pool tests Completed
-
Evening (After 5pm) Check and Clean Finnish Sauna as required
-
Evening (After 5pm) Check and Clean Eucalyptus Steam Room as required
-
Evening (After 5pm) Check and Clean Alchemist Steam Room as required
-
Evening (After 5pm) Check and Clean Banya Sauna as required
-
Evening (After 5pm) Check and Clean Large Barrel Sauna as required
-
Evening (After 5pm) Check and Tidy pool deck as required Straighten Chairs
-
6:30 Pm Hotel Pool tests Completed (Alkalinity Testing )
-
7:00 pm Spa Pool test Completed (Alkalinity Testing)
-
7:00 pm Men's Changeroom Re-Stock and Sanitize
-
Check and Replace Hotel Waterpark Pool Chemical Containers (Acid and Chlorine)
-
Check and Replace Hotel Hot Pools Chemical Containers (Acid and Chlorine)
-
Check and Replace Main Mechanical Room Chemical Containers (Acid and Chlorine)
-
Check and Replace Banya Mechanical Room Chemical Containers (Acid and Chlorine)
-
Rinse all empty Chlorine Containers in Pools and dispose of containers
-
Refill all Acid jugs as required
-
830 Pm Hotel Pool testing Completed
-
9:00 pm Spa Pool testing Completed
-
Tidy Work Station Banya Mechanical Desk area
-
Closing (After 9 pm) Check and Clean Finnish Sauna as required
-
Closing (After 9 pm) Check and Clean Eucalyptus Steam Room as required
-
Closing (After 9 pm) Check and Clean Alchemist Steam Room as required
-
Closing (After 9 pm) Check and Clean Banya Sauna as required
-
Closing (After 9 pm) Check and Clean Large Barrel Sauna as required
-
Closing (After 9 pm) Check and Tidy pool deck as required Straighten Chairs
-
1015 Pm Hotel Pool testing Completed
-
Tidy Work Station Hotel Pool Desk area
-
Gathering Pool Scum Line Cleaned
-
Hot Pool Scum Line Cleaned
-
Cold Plunge Pool Scum Line Cleaned
-
Elements Pool Scum Line Cleaned
-
Reflection Pool Scum Line Cleaned
-
Gathering Pool Vacuumed
-
Small Hot Pool Pool Vacuumed
-
Cold Plunge Pool Pool Vacuumed
-
Elements Pool Vacuumed
-
Reflections Pool Vacuumed
-
Lights Off and Locked up Finnish Sauna
-
Garbage Cans by Exfoliation Cabin Stored in Steam Cabin
-
Lights Off and Locked up Steam Cabin
-
Lights Off and Locked up Exfoliation Cabin
-
Lights Off and Locked up Banya Sauna
-
Lights Off and Doors closed tight Banya Washrooms x 2
-
Lights Off and Locked up Large Barrel Sauna
-
Garbage Cans by Elements pool stored in Main Mechanical Room
-
Garbage Cans by Entrance to Three-Story stored inside Spa Attendant Reception
-
Lock Spa attendant Reception doors
-
Two Trees second level doors closed tight x 2 doors
-
Two Trees First Level Doors Locked x 3 doors
-
TwoTrees Gate access locked and secured
-
Three Storey Fire Exit by Main Mechanical Room Locked and secured
-
Three Storey Third level all doors closed ( 2 x fire exits, 2 x hallway doors, 8 x treatment rooms, 1 washroom, 1 storage room, 1 office)
-
Three Storey Third Level all lights off
-
Three Storey Third Level Fireplace Off
-
Three Storey Second Level all lights off
-
Three Storey Second Level Main Doors Locked x 2
-
Three Storey First Level Staff Entrance Door Locked
-
Lock Paddlelock on Staff Entrance Gate
-
Lock Parkade doors X 2
-
Turn out lights in Laundry room
-
Additional Tasks Completed