Information

  • Audit Title

  • Conducted on

  • Prepared by

Tenant/Homeowner Details

  • Name

  • Address
  • Phone Number

  • Mobile Number

  • Email Address

  • Preferred Contact Method

Client/Landlord Details

  • Name

Property details

Property Details

  • Property Type

  • Building finish

  • Number of Bedrooms

  • Type of Heating

  • Insulation Works Required

  • Structural condition

  • External Wall Condition

  • Adequate ventilation to work area

  • Dampness or water damage

  • Photo of each elevation

  • Building defects

  • Special Instructions

Access

  • On site parking

  • Client Instructions

  • Access Issues

  • Access Equipment Required

Cavity Wall Insulation

Details

  • Test

  • Total area to be insulated

  • Required material

  • Average Cavity Depth

  • Boroscope photo

  • Number of Cavity brushes required

  • Core vent required

  • List any defects

  • Photo of any defects

  • List all access issues

  • Photo of access issues

  • Location of chimneys

  • Location of flues

  • Does the property have existing insulation with a residual cavity?

  • Is the residual cavity wall insulation suitable to receive EPS bead?

  • Residual Cavity Width?

  • Is DPC minimum of 150mm above floor level?

  • Photo of DPC level

Extraction

  • Total area to be extracted

  • Reason for extraction

  • Material being extracted

  • Recommended cavity drying time

  • Are all apertures sealed internally

  • Has client been advised on extent on drilling and core holes

Loft Insulation

  • Photos of loft

  • Area to be insulated

  • Existing Depth

  • Photo of existing depth

  • Depth to be added

  • Relay Required

  • Loft hatch needing D/P

  • Loft vents required

  • Areas to be omitted

  • Walkway required

  • Loft Extraction

  • Additional notes

  • Please Note All High Powered Cables and Downlights

  • Are there existing pipes & tanks in use?

Condensation and Ventilation and Other Property Issues

Condensation or Damp Issue

  • Add media

Other Property Issues

  • Add media

Dynamic Risk Assessment & Client Declaration

Dynamic Risk Assessment

  • I have assessed the conditions on site ensuring there is adequate ventilation. Unless listed below, there are no additional significant hazards observed that are not addressed in the generic risk assessment for the work to be undertaken.

  • Assessors signature

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.