Title Page
Project Information
-
Project
-
Auditor
-
Project Manager
-
Site Manager
-
Location
-
Date
-
Time arrived
-
Duration
BUSINESS STREAM
-
Capital
-
Distribution
-
EHV
-
Connection
-
Score, 0=No Compliance 1=Some Compliance 2=Compliance N/A=Not Applicable
1. Facilities / Welfare
-
1.1 Are site welfare facilities on site?
-
1.2 Are they adequate for the number of operatives in line with legislation?
-
1.3 Are they clean?
-
1.4 Is the Law poster present and filled in?
-
1.5 Is the F10 displayed with relevant parties indicated?
-
1.6 Is there an Emergency plan displayed?
-
1.7 Are the site rules present & displayed?
-
1.8 Is a fire extinguisher present and in date?
-
1.9 Is a first aid box present including eye wash?
-
1.10 Is an accident book present?
-
1.11 Has a 1st Aider been identified
-
Additional information
2. Documentation
-
2.1 Pre-construction Phase Plan
-
2.2 Construction Phase Plan
-
2.3 Engineering report (if applicable)
-
2.4 Excalon RAMS for current work activities - Briefed and signed
-
2.5 Construction Drawings
-
2.6 Traffic Management<br> Drawings
-
2.7 Accreditations / Safety Passports
-
2.8 Site Induction - Briefed and signed
-
2.9 Utility drawings
-
2.10 Are emergency plans in place for ALL possible hazardous situations?
-
2.11 Temporary Work Flow Chart
-
2.12 Is there a SWMP present on site?
-
2.13 Is the SWMP being developed?
-
2.14 Correspondence for the project
-
Additional information
3. Yard
-
3.1 PPE worn in accordance with RAMS
-
3.2 Signage
-
3.3 Has the Fire Assembly Point been identified?
-
3.4 Gas Storage
-
3.5 Cable Storage
-
3.6 COSHH Storage
-
3.7 Spill Kits
-
3.8 Drip trays
-
3.9 Fuel bowser
-
Additional information
4. Site Management
-
4.1 Planning/Organisation of project
-
4.2 PPE worn in accordance with RAMS
-
4.3 Management of Signing & Guarding as per NRASWA
-
4.4 Barriers checks
-
4.5 Parking of company vehicles
-
4.6 Secured storage area for equipment and materials
-
4.7 HSG47 (mark up / trial holes)
-
4.8 GS6 Working under Overhead Power Lines
-
4.9 Spill kits
-
4.10 Drip trays
-
4.11 Fire extinguisher (present & in date)
-
4.12 First aid kit
-
4.13 De-watering / correct procedure carried out
-
Additional information
5. Overall
-
5.1 General housekeeping
-
5.2 Does site manager and team leader portray correct attitude and understanding towards safety, quality & environmental aspects of the project
-
Additional information
Score
-
CAT 1 (0% > 49%)
-
Immediate Rectification Required to comply with CDM Regulations 2007
-
CAT 2 (50% > 74%)
-
Rectification required within 24hrs
-
CAT 3 (75% > 94%)
-
Rectification required within 7 working days
-
CAT 4 (95% > 100%)
-
Good overall audit - Please rectify defects ASAP
-
Signature