Information
-
Document No.
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
1. Facilities
-
1.1 Are site welfare facilities on site
-
1.2 Are they adequate for the number of operatives
-
1.3 Are they clean
-
1.4 Is the Law poster present and filled in
-
1.5 Is the F10 displayed with relevant parties indicated
-
1.6 Is there an Emergency plan displayed
-
1.7 Are there site rules displayed
-
1.8 Is a fire extinguisher present and in date
-
1.9 Is a first aid box present including eye wash
-
1.10 Is an accident book present
2. Documentation Present in file
-
2.1 Pre-construction Phase Plan
-
2.2 Construction Phase Plan
-
2.3 Client RAMS (if applicable)
-
2.4 Excalon RAMS
-
2.5 Construction Drawings
-
2.6 Traffic Management<br> Drawings
-
2.7 Accreditations
-
2.8 Correspondence for project
3. Utility Drawings
-
3.1 Electric
-
3.2 Gas
-
3.3 Water
-
3.4 BT
-
3.5 Waste Water
-
3.6 Confirmation of Site Induction
4. Site Management
-
4.1 Planning/Organisation of project
-
4.2 Storage of materials
-
4.3 Parking of company vehicles
-
4.4 Utilities Mark up present
-
4.5 Personal Protective Equipment enforced and used
-
4.6 Footwear
-
4.7 Visibility Jackets
-
4.8 Gloves
-
4.9 Hard hat
-
4.10 Dust Masks
-
4.11 Goggles
-
4.12 Management of Signing & Guarding
-
4.13 Information Boards
-
4.14 Spill kits & Disposable bins
-
4.15 De-watering/correct procedure carried out
5. Documentation for known Hazards
-
5.1 NG Gas notification of works adjacent to system
-
5.2 Line Search
-
5.3 Overhead Line RAMS
-
5.4 Permit to Dig (if required)
-
5.5 Permit for Hot Works (if required)
6. Overall
-
6.1 Does team manager portray correct attitude and understanding towards safety, quality & environmental aspects for the project
-
Inspected by
-
Project Manager
-
Select date
-
Summary Log
-
Audit Reference