Underground utilities marked/identified before digging?
-
Digging around assets with close approach tickets
-
Hand digging or pot holing to be performed before and during excavation at all time with a qualified spotter
-
Excavations/trenches over 1m deep must be either "benched" or "stepped" and/or require a "shoring" device
-
Spoil pile must be a minimum of 500mm from the edge of excavation/trenches
-
Temporary fencing must be used when excavation is unattended
-
All workers on site must have correct personal protective equipment "PPE"
-
Workers must be a minimum of 5m from plant equipment at all times
-
Audible alarms functioning properly on excavation equipment?