Information
-
Audit Title
-
Client / Site
-
Conducted on
-
Prepared by
-
Location
-
Personnel
PPE
-
Hard Hats
-
Glasses/Goggles/Faceshield
-
Harness and Lanyard Use
-
Hearing Protection Needed
-
Proper Clothing
-
Tools Inspected
-
Guards in Place
Equipment
-
Inspected Daily
-
Back Up Alarm working
-
Free from excessive leaks
-
Seatbelt Use
-
3 points of contact on/off
-
Load capacity chart posted in cab
-
20' away from power lines
-
Cab glass and wipers in good condition
-
Charged fire extinguisher
General
-
Employees protected from cave-ins and loose rock/soil
-
Spoils at least 2' back from edge of excavation
-
Trench boxes being used if needed
-
Adequate signs posted and barricades provided
-
Housekeeping in good shape
Utilities
-
Utility company contacted or utilities already marked
Wet conditions
-
Dewatering is being done
-
Inspection made after every rainstorm or snow
Hazardous Atmospheres
-
Air in the excavation tested for O2 deficiency, combustibles, etc
-
Ventilation provided if necessary
-
Emergency equipment available
-
Safety harness and life line being used properly
-
Supplied air necessary
Entry and Exit
-
Exit no further than 25' from any employee
-
Ladders secured and extend 3' above the edge go the trench
-
Employees protected from cave ins when entering and exiting
Sign Off
-
On site representative
-
Auditor's signature