Title Page
-
Client - Mattison Scaffolding LTD
-
Mattison Scaffolding Division
-
Site Name/Address (What-Three-Words)
-
Location of Scaffolding
-
Location of Site Offices
-
Conducted on
-
Inspectors Name
-
Were Sub-Contractors on Site at the time of the Inspection
Site Specific Documents
-
Is a bespoke design configuration applicable to the scaffolds constructed on site?
-
Is a design matrix in place?
-
Do all completed/handed over design scaffolds have a "Working Design"
-
Are all designed scaffolds erected in accordance with the supplied design drawings?
-
Is TG20 applicable to the scaffolds constructed on-site?
-
Have compliance sheets been issued to site?
-
Are all scaffold's erected in accordance with the supplied TG20 compliance sheets
-
Are any system scaffolds constructed on site?
-
Is the system scaffold erected in accordance with the system manufacturers instructions
-
Has Anchor Testing been undertaken in accordance with TG4:19 and certificates been completed?
-
Are 'Scafftags' in use on-site?
Scaffold Inspection
- Scaffold
-
Description of the Scaffold Being Inspected
-
Inspection Time
Observations: -
-
Details of any matters identified that could give rise to a risk to the health or safety of any of person.
-
Action
-
Inspection Summary
- The scaffold inspected is safe for use at the time of the inspection
- Minor defects/observations were found while inspecting the scaffold but the scaffold remains safe. (Observations and recommended actions are detailed throughout the report).
- The scaffold was found to be unsafe. The author has prohibited the use of the scaffold until remedial action is taken.
Report Sign Off
-
All NASC Safety Guidance documents are available to download from here https://nasc.org.uk/shop/
-
If applicable and where design engineers confirmation has been requested, please store all relevant information (Engineers design confirmation) with the site file
-
Additional comments/notes (If Applicable)
-
Disclaimer - The inspector(s) believe the information contained within this report to be correct at the time of the visit. The report is based on matters which were observed or came to the attention of the inspector(s) during the assessment and should not be replied upon as an exhaustive record of all possible risks or hazards that may exist or potential improvements that can be made.
-
Inspection Completed By