SA Water Contract Audit Report
-
Contractor
-
Audit No.
-
Conducted on
-
Prepared by
-
Location
Construction/Maintenance of SA Water Assets
-
Job Classification
-
Ensure all prior notifications e.g. traffic management, dewatering, hold points, TSA Road permit and Variations (including material / labour and equipment used on site) are taken note of. do they comply?
-
Waste Water Construction/Maintenance
-
Work Witnessed
- Excavation
- Bedding
- Laying
- Manhole
- Cleaning
- Civil Works
- Compaction
- Levels
- Connections
- Link Up
- Valves
- Fireplugs
- Bitumen
- Other (see notes)
-
Have all works witnessed been completed adhering to SA Water Standards?
-
Is construction/maintenance being followed in accordance with the assigned designs?
-
Relevant Photos:
-
Other Notes
-
Water Construction/Maintenance
-
Work Witnessed
- Excavation
- Bedding
- Laying
- Manhole
- Cleaning
- Civil Works
- Compaction
- Levels
- Connections
- Link Up
- Valves
- Fireplugs
- Bitumen
- Other (see notes)
-
Have all works witnessed been completed adhering to SA Water Standards?
-
Is construction/maintenance being followed in accordance with the ASCON designs?
-
Relevant Photos:
-
Other Notes
-
Other Construction/Maintenance
-
Work Witnessed
- Excavation
- Bedding
- Laying
- Manhole
- Cleaning
- Civil Works
- Compaction
- Levels
- Connections
- Link Up
- Valves
- Fireplugs
- Bitumen
- Other (see notes)
-
Have all works witnessed been completed adhering to SA Water Standards?
-
Is construction/maintenance being followed in accordance with the ASCON designs?
-
Relevant Photos:
-
Other Notes
WHS/EM Compliance
-
Is the work site and surrounds in satisfactory condition?<br>ie. clear of debris, rubbish removed
-
Environmental Management?
-
Were workers on-site at the time of visit?
-
Personal Protective Equipment?
-
Sight Dial-B4-U-Dig plans and any information supplied on for other obstructions e.g. <br>- High Voltage SAPN permit – is power isolated?<br>- High pressure gas<br>- Fibre optic cables <br>- Sight pre-con checklist and sign site induction form. (Contractor to inform SA Water personnel of site hazards).<br>
-
Worksite Safety measures ie. shoring, harnesses
-
Do all employees have White Card, Company ID card, Traffic Management Card?
-
Traffic Guidance must be to the Australian Standard AS1742 - Manual of Traffic Control Devices.<br>- Sight Traffic Management plans (should be drawn up by Leading Hand before work starts) to divert traffic and pedestrians. <br>- If External company used – site traffic management plan prepared by company. <br>- If Road closed – Check detours are in place, advanced warning signs, Barriers around trenches, footpath closed, use other footpath signs.<br>
-
Are any Abestos related activities taking place?
-
Do all works comply with -Working with Asbestos pipes SOP - 71543
-
Officer Signature