Title Page
-
Location
-
Conducted on
-
Installed by
-
Inspected and approved by
-
Prepared by
REMOVAL OF EXISTING MATERIALS
-
Have pre-condition photos been taken?
-
Has the existing cladding been removed?
-
Has the existing insulation been removed?
-
Has the existing plywood substrate been removed?
RECORDS OF CEMENT BOARD INSTALLATION
-
Has the cement board been installed according to the manufacturer's guidelines?
-
Have all the joints been taped?
BREATHER MEMBRANE INSTALLATION
-
Has the breather membrane been installed and correctly lapped?
-
Has the breather membrane been taped to the window/door system's head/sill/jamb?
HELPING HAND BRACKETRY
-
Have the horizontal top hat rails been installed, correctly spaced and fixed with sealing washers?
-
Have the helping hand brackets been installed, correctly spaced, vertically aligned and with correct fixings?
FIRE BARRIERS INSTALLATION
-
Are the brackets for vertical fire breaks installed at a maximum of 600 mm centres?
-
Have the vertical fire breaks been installed as manufacturers recommendations?
-
Have the vertical fire breaks been installed to allow a 10 mm compression to the cladding?
-
Are the brackets for horizontal fire breaks installed at a maximum of 400 mm centers?
-
Have the horizontal fire breaks been installed according to the manufacturer's guidelines?
-
Have the horizontal fire breaks been installed at the correct depth and situated at a 25 mm depth from the inside face of the new panel?
INSULATION INSTALLATION
-
Has the insulation been installed in the correct orientation and correctly staggered?
-
Has the correct number and type of fixings been used?
CLADDING PANELS
-
Have the vertical cladding rails been installed and correctly aligned?
-
Has the intumescent strip been installed in vertical rail at cavity barrier crossovers?
-
Have the horizontal cladding rails been installed and correctly aligned?
-
Have the cladding panels been installed and correctly aligned?
COMPLETION
-
Are all materials installed according to the manufacturers guidelines?
-
Are all installed materials free of defects?