Information

  • Document No.

  • Audit Title

  • Client / Site

  • Conducted on

  • Prepared by

  • Location
  • Personnel

  • Type of survey conducted

  • Type of site surveyed

  • Does the building have a DEC

  • Enter rating of DEC

  • Does the building have a valid EPC

  • Enter rating of EPC

  • Confirm MPAN

  • Name of site agent / manager

  • Contact number for site manager

  • Email for site manager

Site Access for deliveries

  • Is access to work area safe and free from obstruction

  • Largest size delivery vehicle the site will accommodate

  • Photo of access routes

Site Storage

  • Is there a safe place on site for storage of kit

Site facilities

  • Are there toilets and kitchen facilities on site

Technologies considered for installation

  • Select primary technology to be installed

  • Are any other technologies suitable or recommended for consideration

Roof type and construction

  • Select roof type

  • Select roof construction

  • Can the install be completed with standard fixings

  • Roof height to eaves in metres

  • Roof length in metres

  • Roof Width in metres

  • Roof pitch in degrees

  • Roof Halfspan in metres

  • Roof orientation ( approximate )

  • Is there any evidence of asbestos in the roof material

  • Can the installation be completed under the competent persons scheme without a structural engineers report

  • Draw or upload a sketch of roof

  • Upload google earth roof plan

  • Photo of roof to be installed

Mounting system type

  • Select mounting system

Module type and layout

  • Can standard modules be used without restriction

  • Is the roof clear of obstructions

  • Photo of roof obstructions

  • Are there any obvious shading issues

  • Describe level of shading

  • Will the installation meet the requirements given under central planning and building control regulations

Access equipment locations and issues

  • Type of access equipment required

  • Select additional access equipment required

  • Can all scaffold be erected easily

  • Will scaffold require Herras fencing to create a safe work area

  • Will a loading area be required

  • Enter estimated scaffold cost

Main AC connection point

  • Select phase type of main AC connection point

  • Main AC connection voltage

  • Main AC connection fuse rating ( Amps )

  • If VPO is under consideration which product is most suitable

  • Photo of main AC connection point

  • Select DNO application type

MCB requirements

  • Can installation be completed with standard parts

  • Is there any evidence of asbestos in the main consumer unit

Generation meter location

  • Can the generation meter be mounted next to the inverters

Inverter location and fixing detail

  • Describe potential inverter locations

  • Photo of inverter location

Isolation location AC / DC

  • Can standard commercial AC / DC isolators be used

DC string route and containment

  • Describe DC route and containment requirement

  • Suggested DC cable size based on length of run

AC cable route and containment

  • Describe AC cable route and containment requirement

  • Type of AC cable required

  • Can the system be installed without earthing

Remote monitoring logger / gsm

  • Select monitoring type

  • Describe location and type of monitoring system

  • Any other information

Sign off and management review

  • Surveyor

  • Electrical Engineer

  • Roofing Team Manager

  • Director / Chief Engineer

The templates available in our Public Library have been created by our customers and employees to help get you started using SafetyCulture's solutions. The templates are intended to be used as hypothetical examples only and should not be used as a substitute for professional advice. You should seek your own professional advice to determine if the use of a template is permissible in your workplace or jurisdiction. You should independently determine whether the template is suitable for your circumstances.